Skip to main content

Kapsch to open free-flow road to Rio

Tolling project is on BR-101 which connects Rio de Janeiro and Santos in Brazil
By Adam Hill January 20, 2023 Read time: 1 min
With more than 60,000km of highway, the Brazilian road network is one of the longest in the world (© Eduard Goricev | Dreamstime.com)

In March, Kapsch TrafficCom is to open the first part of a major free-flow tolling project in Brazil on 200km of the highway which connects Rio de Janeiro and Santos.

The BR-101 highway connects the country's most populous states is concessioned by CCR RioSP.

The coast road was completed in 1972 and is used daily by approximately 10,000 commercial vehicles.

Kapsch says the system is the first of its kind in Brazil since the required legislation was introduced in 2021.

"With more than 60,000km of highway, the Brazilian road network is one of the longest in the world, so this is a particularly strong lever for improving the traffic situation and reducing emissions," says Samuel Kapsch, executive vice president for Latin America at Kapsch TrafficCom.

Kapsch TrafficCom has been active in Latin America since 2000 and has now implemented projects in 10 countries and 19 cities in the region, focusing primarily on modern tolling systems and intelligent traffic management for highways and cities to avoid congestion and reduce emissions. 

Related Content

  • August 16, 2022
    Queensland C-ITS safety boost
    Bruce Highway project involving Kapsch TrafficCom expected to reduce crashes by 20%
  • January 14, 2022
    Kapsch free-flow tolls come to New Hampshire
    The sites Kapsch will convert from mixed-pay to AET are at Dover, Rochester and Bedford
  • January 27, 2015
    Kapsch to provide radio infrastructure for Rio metro
    Kapsch has been selected to provide the TETRA radio infrastructure for a new metro line in Rio de Janeiro, Brazil. Kapsch will provide four base stations, 30 in-train cab radios and 140 hand-held portable radios, as well as planning, design and deployment, to integration with existing communications systems on other metro lines. With 15 trains serving six major stations, the new Line 4 will take more than 2,000 cars off the road at peak times, helping to resolve some of the city’s worst traffic bott
  • January 27, 2015
    Kapsch to provide radio infrastructure for Rio metro
    Kapsch has been selected to provide the TETRA radio infrastructure for a new metro line in Rio de Janeiro, Brazil. Kapsch will provide four base stations, 30 in-train cab radios and 140 hand-held portable radios, as well as planning, design and deployment, to integration with existing communications systems on other metro lines. With 15 trains serving six major stations, the new Line 4 will take more than 2,000 cars off the road at peak times, helping to resolve some of the city’s worst traffic bott