Skip to main content

Joint venture to build Houston toll road expansion

The Texas Department of Transportation Commission has awarded the design-build contract for segments H&I of State Highway 99/Grand Parkway in the Houston area to Grand Parkway Infrastructure, a joint-venture of Ferrovial Agroman US, Webber and Granite Construction. The US$855 million project northeast of Houston spans 52.5 miles through Chambers, Harris, Liberty and Montgomery counties and will substantially increase capacity along SH 99 with the construction of one to two new tolled lanes in each direct
March 31, 2017 Read time: 1 min
The 375 Texas Department of Transportation Commission has awarded the design-build contract for segments H&I of State Highway 99/Grand Parkway in the Houston area to Grand Parkway Infrastructure, a joint-venture of 4419 Ferrovial Agroman US, Webber and 7973 Granite Construction.

The US$855 million project northeast of Houston spans 52.5 miles through Chambers, Harris, Liberty and Montgomery counties and will substantially increase capacity along SH 99 with the construction of one to two new tolled lanes in each direction between US 59 to Interstate 10 (I-10) and four additional toll lanes.

In addition to constructing new tolled lanes and upgrading the tolling infrastructure on SH 99 from I-10 to FM 1405, the partnership will also be responsible for maintaining portions of the project, which is expected to be completed within the next six years.

Related Content

  • July 4, 2014
    Parsons Brinckerhoff to modernise Michigan freeway
    Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
  • April 25, 2013
    Diverse development of tolling business models
    A diversity of tolling business models offers a wider toolbox of highway finance options, as the IBTTA’s Patrick Jones explains. The business models for America’s tolled highways have gone through several different evolutions over the last 75 years, reflecting a succession of shifts in transportation policy and politics, financing and funding models, urban patterns, customer needs, and technology. And with more and more decision-makers expressing renewed interest in tolling, it’s that very diversity that ma
  • July 23, 2015
    Jacobs JV awarded contract for California high speed rail
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
  • March 19, 2014
    Asking drivers what information they need: radical but effective
    When Texas A&M Transportation Institute was asked to devise a temporary traveller information system for work zones, it started by asking drivers what they need. Robert Brydia explains the thinking, implementation and results. US Interstate 35 (I-35) runs roughly north–south originating in Laredo, Texas and ends 1,500 miles away in Duluth, Minnesota having passed through Oklahoma, Kansas, Missouri and Iowa. Within Texas the I-35 splits into I-35E and I-35W passing through Dallas and Fort Worth respectiv