Skip to main content

Joint venture to build Houston toll road expansion

The Texas Department of Transportation Commission has awarded the design-build contract for segments H&I of State Highway 99/Grand Parkway in the Houston area to Grand Parkway Infrastructure, a joint-venture of Ferrovial Agroman US, Webber and Granite Construction. The US$855 million project northeast of Houston spans 52.5 miles through Chambers, Harris, Liberty and Montgomery counties and will substantially increase capacity along SH 99 with the construction of one to two new tolled lanes in each direct
March 31, 2017 Read time: 1 min
The 375 Texas Department of Transportation Commission has awarded the design-build contract for segments H&I of State Highway 99/Grand Parkway in the Houston area to Grand Parkway Infrastructure, a joint-venture of 4419 Ferrovial Agroman US, Webber and 7973 Granite Construction.

The US$855 million project northeast of Houston spans 52.5 miles through Chambers, Harris, Liberty and Montgomery counties and will substantially increase capacity along SH 99 with the construction of one to two new tolled lanes in each direction between US 59 to Interstate 10 (I-10) and four additional toll lanes.

In addition to constructing new tolled lanes and upgrading the tolling infrastructure on SH 99 from I-10 to FM 1405, the partnership will also be responsible for maintaining portions of the project, which is expected to be completed within the next six years.

Related Content

  • Lindsay zips-up lane closure solution
    May 11, 2017
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.
  • Washington’s new traffic cameras go online
    December 7, 2012
    Drivers in Washington State can now get real time travel information on Interstate 5 between Rochester and Tumwater. Six new traffic cameras have been installed as part of the I-5 Grand Mound to Maytown Stage 2 project, one of four projects funded by US$390 million from the 2003 and 2005 fuel tax packages to improve traffic flow and safety along an eighteen-mile stretch of I-5 in Lewis and Thurston counties. The new cameras not only give the 56,000 drivers who use this section of I-5 daily a real-time look
  • IBTTA announces Toll Excellence & DEI Awards winners
    September 10, 2024
    Projects range from congestion relief programmes to enhancing community engagement
  • Urban tunnel replaces viaduct, improves safety
    October 10, 2012
    Earthquake sensors, automatic barriers and real time monitoring systems are all part of a scheme to make a major Seattle traffic artery safer, by taking it underground. Huw Williams reports. Seattle’s metropolitan area of 3.5 million people, like much of the western seaboard of the United States, lies in an earthquake zone. In Seattle’s case, the city and its hinterland sit atop a complex network of interrelated active geological faults capable of severe seismic activity and posing complex considerations fo