Skip to main content

Joint venture to build Houston toll road expansion

The Texas Department of Transportation Commission has awarded the design-build contract for segments H&I of State Highway 99/Grand Parkway in the Houston area to Grand Parkway Infrastructure, a joint-venture of Ferrovial Agroman US, Webber and Granite Construction. The US$855 million project northeast of Houston spans 52.5 miles through Chambers, Harris, Liberty and Montgomery counties and will substantially increase capacity along SH 99 with the construction of one to two new tolled lanes in each direct
March 31, 2017 Read time: 1 min
The 375 Texas Department of Transportation Commission has awarded the design-build contract for segments H&I of State Highway 99/Grand Parkway in the Houston area to Grand Parkway Infrastructure, a joint-venture of 4419 Ferrovial Agroman US, Webber and 7973 Granite Construction.

The US$855 million project northeast of Houston spans 52.5 miles through Chambers, Harris, Liberty and Montgomery counties and will substantially increase capacity along SH 99 with the construction of one to two new tolled lanes in each direction between US 59 to Interstate 10 (I-10) and four additional toll lanes.

In addition to constructing new tolled lanes and upgrading the tolling infrastructure on SH 99 from I-10 to FM 1405, the partnership will also be responsible for maintaining portions of the project, which is expected to be completed within the next six years.

Related Content

  • September 15, 2014
    Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • May 2, 2024
    Highway 99 revisited
    The effects of Covid are still being felt. David Arminas considers how the pandemic has affected toll revenue on Seattle’s newish SR99 tunnel – and looks at the traffic management and emergency plans in place for drivers
  • June 28, 2017
    Astaldi wins rail upgrade contract in Poland
    The Italian Astaldi Group has been awarded the contract by Polskie Linie Kolejowe (PKP) to upgrade a section of the E-59 Warsaw-Poznań railway line (Lot IV).
  • July 28, 2014
    I-69 Section 5 to go ahead
    The Indiana Finance Authority (IFA) and I-69 Development Partners reached financial close on section 5 of I-69 Section 5 from Bloomington to Martinsville. The 142-mile I-69 corridor is divided into six sections. The first three sections opened for business in November 2012 and construction is underway on all 27 miles of I-69 Section 4 between Crane and Bloomington. I-69 Section 5 involves repairing and upgrading 21 miles of the existing, four-lane State Road 37 to interstate standards. I-69 Developmen