Skip to main content

Joint venture to build Houston toll road expansion

The Texas Department of Transportation Commission has awarded the design-build contract for segments H&I of State Highway 99/Grand Parkway in the Houston area to Grand Parkway Infrastructure, a joint-venture of Ferrovial Agroman US, Webber and Granite Construction. The US$855 million project northeast of Houston spans 52.5 miles through Chambers, Harris, Liberty and Montgomery counties and will substantially increase capacity along SH 99 with the construction of one to two new tolled lanes in each direct
March 31, 2017 Read time: 1 min
The 375 Texas Department of Transportation Commission has awarded the design-build contract for segments H&I of State Highway 99/Grand Parkway in the Houston area to Grand Parkway Infrastructure, a joint-venture of 4419 Ferrovial Agroman US, Webber and 7973 Granite Construction.

The US$855 million project northeast of Houston spans 52.5 miles through Chambers, Harris, Liberty and Montgomery counties and will substantially increase capacity along SH 99 with the construction of one to two new tolled lanes in each direction between US 59 to Interstate 10 (I-10) and four additional toll lanes.

In addition to constructing new tolled lanes and upgrading the tolling infrastructure on SH 99 from I-10 to FM 1405, the partnership will also be responsible for maintaining portions of the project, which is expected to be completed within the next six years.

For more information on companies in this article

Related Content

  • Temporary traffic monitoring with Bluetooth and wi-fi
    May 31, 2013
    David Crawford reviews developments in temporary ITS. Widespread take-up of technologies such as Bluetooth and wi-fi are encouraging the emergence of more sophisticated, while still cost effective, ITS responses to the traffic issues posed by temporary road situations such as work zones and special events. Andy Graham of traffic solutions specialists White Willow Consulting says: “A machine-to-machine radio link is far easier and cheaper than reading characters on a plate.” There can be other plusses. Tech
  • Joining old and new in Canada’s Highway 407
    June 17, 2016
    David Arminas visits Canada’s Highway 407 ETR to see how the concession is working and hear about new arrangements for the roadway’s extension. The Toronto region is North America’s eighth largest metropolitan area and its roads become notoriously congested. In 1997 Highway 407, a 68km concrete toll motorway which skirts the northern edge of Toronto, was opened and initially operated by the province and CHIC - a consortium of four leading Ontario-based companies. Finance came from the Ontario Financing Auth
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • Managed lane free flow tolling system to keep El Paso moving
    March 1, 2013
    Two new managed toll lanes being built on nine miles of the César Chávez Border Highway Loop 375 in El Paso, Texas are expected to increase capacity and reduce traffic congestion in the area thanks to a managed lane free flow tolling system to be supplied by Schneider Electric. The company has been selected by the Camino Real Regional Mobility Authority (CRRMA) to provide tolling system integration and maintenance services on the two new managed lanes. In order to operate and support the additional toll la