Skip to main content

Irish tunnel contracts awarded to Egis

Ireland’s National Roads Authority (NRA) has awarded Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of six years, with a possible four-year extension. This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance. It also includes the operation and maintenance of the
October 16, 2014 Read time: 2 mins
Ireland’s National Roads Authority (NRA) has awarded 7319 Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of  six years, with a possible four-year extension.

This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance.

It also includes the operation and maintenance of the Jack Lynch Tunnel in Cork and the motorway traffic control centre currently based in the Dublin Tunnel.

With 15,000 vehicles per day including 6,800 heavy goods vehicles (HGVs), the Dublin Tunnel provides a direct link between the M1 Dublin-Belfast motorway and the Dublin Tunnel, avoiding the city centre. It reduces the number of HGVs using surface streets in the historic centre of Dublin and eases traffic flow to and from the Dublin Port.

This flagship project in Ireland’s National Development Plan is a 4.5 kilometre twin tube tunnel, each equipped with emergency facilities such as access ways between tunnel tubes, lay-bys, emergency phone network, CCTV and other services. All services are provided by 6190 Egis Road & Tunnel Operation Ireland with an operations building located at the southern end of the tunnel.

The 0.6 kilometre long Jack Lynch Tunnel in Cork is an immersed twin tube tunnel under the River Lee to the east of Cork City Centre. It forms part of the N40 Cork southern ring road and also provides a route from the N8 and N25 from the east and north-east into the city centre.

For more information on companies in this article

Related Content

  • Citilog ITS helps avert tragedy in Vuache Tunnel
    June 25, 2025
    Automatic incident detection systems allowed ATMB to close tunnel
  • Transportation hub the centre of sustainable urban development
    November 21, 2012
    A marriage of transit, technology and culture is taking shape in Minneapolis, with ITS systems vital to hopes for a sustainable development centred on a hub of public transportation. Construction started in July this year on ‘The Interchange’ – a station in the Midwest US city of Minneapolis claimed as the most spectacular expression yet of the fast-spreading North American concept of transit-oriented development (TOD). Due for completion in 2014, the Interchange is designed as a multi-modal public transpor
  • Personal Rapid Transit, clear benefits for European cities
    July 26, 2012
    David Crawford watches the race to get the world's first PRT system up and running. To paraphrase the old joke about buses bunching, you seem to have to wait several decades for a Personal Rapid Transit (PRT) system, and then half a dozen come along together. Currently, in fact, there are well over that number of schemes for driverless electric passenger-carrying 'pod' networks at various stages of planning, design and implementation around the world. Locations range from a straight-off-the-drawing board ne
  • IRD wins three tolling contracts in India
    February 3, 2012
    IRDSA (IRD South Asia), the wholly-owned subsidiary of International Road Dynamics (IRD) has signed three tolling contracts in India with a total value of over US$1.5 million.