Skip to main content

Irish tunnel contracts awarded to Egis

Ireland’s National Roads Authority (NRA) has awarded Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of six years, with a possible four-year extension. This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance. It also includes the operation and maintenance of the
October 16, 2014 Read time: 2 mins
Ireland’s National Roads Authority (NRA) has awarded 7319 Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of  six years, with a possible four-year extension.

This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance.

It also includes the operation and maintenance of the Jack Lynch Tunnel in Cork and the motorway traffic control centre currently based in the Dublin Tunnel.

With 15,000 vehicles per day including 6,800 heavy goods vehicles (HGVs), the Dublin Tunnel provides a direct link between the M1 Dublin-Belfast motorway and the Dublin Tunnel, avoiding the city centre. It reduces the number of HGVs using surface streets in the historic centre of Dublin and eases traffic flow to and from the Dublin Port.

This flagship project in Ireland’s National Development Plan is a 4.5 kilometre twin tube tunnel, each equipped with emergency facilities such as access ways between tunnel tubes, lay-bys, emergency phone network, CCTV and other services. All services are provided by 6190 Egis Road & Tunnel Operation Ireland with an operations building located at the southern end of the tunnel.

The 0.6 kilometre long Jack Lynch Tunnel in Cork is an immersed twin tube tunnel under the River Lee to the east of Cork City Centre. It forms part of the N40 Cork southern ring road and also provides a route from the N8 and N25 from the east and north-east into the city centre.

For more information on companies in this article

Related Content

  • Telvent awarded Saudi Arabia traffic management contract
    March 1, 2012
    Telvent has been awarded a contract by Saudi Oger Ltd, with the High Commission for the Development of Arriyadh as the end customer, to implement the its SmartMobility Road Suite solution on King Abdullah Road in Saudi Arabia.
  • Huawei advocates for change
    April 23, 2025
    Achieving technological change also requires a shift in mindset, as Jacky Wang, vice president of Huawei’s Smart Transportation business unit, explains
  • Aecom awarded Hong Kong tunnel contract
    January 16, 2014
    Aecom Technology Corporation has been awarded a consultancy contract worth around US$13 million for the design and an estimated US$103 million contract for the construction supervision of the Tseung Kwan O to Lam Tin (TKO-LT) tunnel project in Hong Kong. The tunnel will include a 2.6-mile, two-lane highway connecting Tseung Kwan O (TKO) at Po Shun Road in the east with the proposed Trunk Road T2 in Kai Tak development in the west. Along with the Central Kowloon Route and Trunk Road T2, the tunnel wil
  • Toll road tender announced
    March 18, 2014
    Moscow has announced a tender to build а toll road parallel to Kutuvkosky Prospekt, stretching from Moscow City’s business centre to the Moscow ring road and meet the M1 toll road. Expected to include four lanes of traffic, the US$1.1 billion project will take five to seven years to build, with the contract between the city and the winning tenderer lasting 40 years. The investor will be able to set the road's fare, though within limits prescribed by Moscow authorities. The city's head of construction,