Skip to main content

Irish tunnel contracts awarded to Egis

Ireland’s National Roads Authority (NRA) has awarded Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of six years, with a possible four-year extension. This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance. It also includes the operation and maintenance of the
October 16, 2014 Read time: 2 mins
Ireland’s National Roads Authority (NRA) has awarded 7319 Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of  six years, with a possible four-year extension.

This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance.

It also includes the operation and maintenance of the Jack Lynch Tunnel in Cork and the motorway traffic control centre currently based in the Dublin Tunnel.

With 15,000 vehicles per day including 6,800 heavy goods vehicles (HGVs), the Dublin Tunnel provides a direct link between the M1 Dublin-Belfast motorway and the Dublin Tunnel, avoiding the city centre. It reduces the number of HGVs using surface streets in the historic centre of Dublin and eases traffic flow to and from the Dublin Port.

This flagship project in Ireland’s National Development Plan is a 4.5 kilometre twin tube tunnel, each equipped with emergency facilities such as access ways between tunnel tubes, lay-bys, emergency phone network, CCTV and other services. All services are provided by 6190 Egis Road & Tunnel Operation Ireland with an operations building located at the southern end of the tunnel.

The 0.6 kilometre long Jack Lynch Tunnel in Cork is an immersed twin tube tunnel under the River Lee to the east of Cork City Centre. It forms part of the N40 Cork southern ring road and also provides a route from the N8 and N25 from the east and north-east into the city centre.

For more information on companies in this article

Related Content

  • Siemens Mobility wins traffic management contract in Northern Ireland
    March 8, 2019
    Siemens Mobility has been chosen by the Department of Infrastructure in Northern Ireland to maintain and develop existing traffic management systems, which are mainly located in Belfast. The scope of the four-year contract includes the maintenance of local systems and the ongoing delivery of a dedicated IP-communications network, which connects 328 urban traffic control (UTC) sites to the central Siemens Mobility UTC and split cycle offset optimisation technique system. The deal is expected to migrate the
  • Improving urban traffic control in Atlanta
    January 27, 2012
    Hugh Colton, Georgia DOT details move to improve urban traffic control in the Atlanta area. With a significant proportion of traffic using freeways and toll-ways, along with a significant investment in roadway infrastructure, urban arterials are often the poor relation when it comes to ITS investment. Hitherto the primary means of Urban Traffic Control (UTC) has been the ubiquitous traffic signal. Many traffic signals still operate in a standalone mode and traffic detection is often broken, leaving the sign
  • IRF reveals global award winners
    November 7, 2022
    ITS projects among those which won IRF's 2022 Global Road Achievement Awards
  • Indra gets on board Cairo monorail
    June 1, 2022
    Group will provide ticketing technology and access control for Egypt's new transit system