Skip to main content

Irish tunnel contracts awarded to Egis

Ireland’s National Roads Authority (NRA) has awarded Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of six years, with a possible four-year extension. This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance. It also includes the operation and maintenance of the
October 16, 2014 Read time: 2 mins
Ireland’s National Roads Authority (NRA) has awarded 7319 Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of  six years, with a possible four-year extension.

This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance.

It also includes the operation and maintenance of the Jack Lynch Tunnel in Cork and the motorway traffic control centre currently based in the Dublin Tunnel.

With 15,000 vehicles per day including 6,800 heavy goods vehicles (HGVs), the Dublin Tunnel provides a direct link between the M1 Dublin-Belfast motorway and the Dublin Tunnel, avoiding the city centre. It reduces the number of HGVs using surface streets in the historic centre of Dublin and eases traffic flow to and from the Dublin Port.

This flagship project in Ireland’s National Development Plan is a 4.5 kilometre twin tube tunnel, each equipped with emergency facilities such as access ways between tunnel tubes, lay-bys, emergency phone network, CCTV and other services. All services are provided by 6190 Egis Road & Tunnel Operation Ireland with an operations building located at the southern end of the tunnel.

The 0.6 kilometre long Jack Lynch Tunnel in Cork is an immersed twin tube tunnel under the River Lee to the east of Cork City Centre. It forms part of the N40 Cork southern ring road and also provides a route from the N8 and N25 from the east and north-east into the city centre.

For more information on companies in this article

Related Content

  • Kapsch finds €4m mobility solution for Vitoria-Gasteiz
    January 22, 2024
    Four-year contract aims to ensure reliable and safe mobility in northern Spanish city
  • Louis Berger and Egis JV to support US rail technology and design
    June 13, 2017
    Louis Berger and Egis have formed an exclusive partnership to meet the project development and delivery needs for mass transit, rail and freight owners and operators in North America, offering experience of managing complex infrastructure projects in the US and abroad through design-bid-build, design-build, P3 and turnkey delivery.
  • Sensor solutions cuts maintenance and emissions
    December 8, 2014
    The new raft of sensor technology can provide cost savings as well as additional functionality, as David Crawford discovers. Austria’s third-largest city, Linz, with a population of around 200,000, is recording substantial savings in its urban tram network within 18 months of introducing a new, high-technology approach to its public transport management. Tram, bus and trolleybus operator Linz Linien forms part of city utilities management company Linz AG, which has been carrying out a wide-ranging Smart Cit
  • Aimsun assesses Spain V2X impact
    June 21, 2022
    An Aimsun project with C-Roads Spain to assess the impact of Day 1 V2X services has been completed: Aimsun senior transportation modeller Laura Torres explains some of the results