Skip to main content

IRD to continue WIM maintenance contract in British Columbia

Quarterhill subsidiary International Road Dynamics (IRD) has been awarded a new five-year contract valued at up to US$4 million (CA$5 million) by the British Columbia Ministry of Transportation and Infrastructure for the continuation of maintenance and services for the Weigh2GoBC Program. The contract also includes options for enhancements and upgrades and for the provision of Weigh2GoBC software, hardware and implementation services to be deployed to additional sites to expand the system network.
July 26, 2017 Read time: 2 mins

Quarterhill subsidiary 69 International Road Dynamics (IRD) has been awarded a new five-year contract valued at up to US$4 million (CA$5 million) by the British Columbia Ministry of Transportation and Infrastructure for the continuation of maintenance and services for the Weigh2GoBC Program.

The contract also includes options for enhancements and upgrades and for the provision of Weigh2GoBC software, hardware and implementation services to be deployed to additional sites to expand the system network.

Weigh2GoBC is a network of weigh-in-motion and automatic vehicle identification technologies designed to enable more efficient movement of commercial vehicles throughout the province. Once a commercial vehicle (equipped with a transponder) in the Weigh2GoBC Program has been initially checked at a Weigh2GoBC enabled station, it can be given a bypass at all subsequent inspection stations for up to the next 24 hours.

IRD has provided the on-site technology, software, integration, and maintenance/service for all the Weigh2GoBC sites. There are 11 locations throughout the province, and the Ministry has plans for additional sites.

For more information on companies in this article

Related Content

  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Modelling MaaS and making it happen
    June 15, 2017
    Colin Sowman looks at some of the emerging technology being introduced to evaluate and operate Mobility as a Service. The fast-growing interest in Mobility-as-a-Service (MaaS) has prompted the creation of a host of software systems for those wanting to become a MaaS provider or participate in MaaS offerings. Most recently, at ITS International’s MaaS Market conference, Portuguese company Brisa Innovation announced a name change to A-to-Be to reflect its increasing involvement in the MaaS sector with the lau
  • Connected Vehicles test vehicle to vehicle applications
    January 19, 2012
    In the US, the ITS Joint Program Office is about to conduct a series of Driver Clinics intended to gauge public reaction to Connected Vehicle safety technologies and applications. Starting in August, the US Department of Transportation (USDOT) will test Vehicle-to-Vehicle (V2V) applications with everyday drivers in what it describes as 'normal operational scenarios'. These Driver Clinics are being carried out at six locations across the US and together with the subsequent model deployment beginning in 2012,