Skip to main content

IRD to continue WIM maintenance contract in British Columbia

Quarterhill subsidiary International Road Dynamics (IRD) has been awarded a new five-year contract valued at up to US$4 million (CA$5 million) by the British Columbia Ministry of Transportation and Infrastructure for the continuation of maintenance and services for the Weigh2GoBC Program. The contract also includes options for enhancements and upgrades and for the provision of Weigh2GoBC software, hardware and implementation services to be deployed to additional sites to expand the system network.
July 26, 2017 Read time: 2 mins

Quarterhill subsidiary 69 International Road Dynamics (IRD) has been awarded a new five-year contract valued at up to US$4 million (CA$5 million) by the British Columbia Ministry of Transportation and Infrastructure for the continuation of maintenance and services for the Weigh2GoBC Program.

The contract also includes options for enhancements and upgrades and for the provision of Weigh2GoBC software, hardware and implementation services to be deployed to additional sites to expand the system network.

Weigh2GoBC is a network of weigh-in-motion and automatic vehicle identification technologies designed to enable more efficient movement of commercial vehicles throughout the province. Once a commercial vehicle (equipped with a transponder) in the Weigh2GoBC Program has been initially checked at a Weigh2GoBC enabled station, it can be given a bypass at all subsequent inspection stations for up to the next 24 hours.

IRD has provided the on-site technology, software, integration, and maintenance/service for all the Weigh2GoBC sites. There are 11 locations throughout the province, and the Ministry has plans for additional sites.

For more information on companies in this article

Related Content

  • Øresund bridges the front line for border crossing traffic
    September 15, 2016
    Timothy Compston considers the challenges faced by the operators of the Øresund Bridge between Denmark and Sweden, the largest structure of its kind across Europe. In light of the concerns about the ongoing security threat and the unprecedented flow of migrants, many of the countries that make up the Schengen Area in Europe have re-introduced border controls. For its part, Sweden has rolled out ID checks for train, bus and ferry passengers from Denmark placing the landmark Øresund Bridge very much on the fr
  • Connected vehicle data promises advanced weather warning
    August 29, 2012
    Connected vehicle research and development is being aimed at improving driver safety and mobility, but is also promising advanced weather monitoring and warning systems. Sheldon Drobot reports. Over the last few years, the United States’ Federal Highway Administration (FHWA) and Research & Innovative Technology Administration (RITA) have joined forces to promote safety, mobility and the environment through a new connected vehicle initiative. This aims to enable wireless communication between vehicles, infra
  • Plug and play approach unifies workzone ITS
    July 18, 2012
    Caltrans District 7 is finalising a ConOps document which will detail a plug-and-play to work zone ITS operation. The organisation's Allen Z. Chen elaborates. Before August is out, on current planning, the California Department of Transportation (Caltrans) District 7 (which covers Los Angeles and Ventura Counties, with a combined population of close to 11 million people) intends to have finalised a Concept of Operations (ConOps) document dealing with Work Zone Transportation Management Systems (WZTMS). The
  • Camera technology a flexible and cost-effective option
    June 7, 2012
    Perceptions of machine vision being an expensive solution are being challenged by developments in both core technologies and ancillaries. Here, Jason Barnes and David Crawford look at the latest developments in the sector. A notable aspect of machine vision is the flexibility it offers in terms of how and how much data is passed around a network. With smart cameras, processing capabilities at the front end mean that only that which is valid need be communicated back to a central processor of any descripti