Skip to main content

International bridge opens new toll lanes, upgrades system

The Sault Ste Marie International Bridge, which connects Sault Ste Marie, Michigan, and Sault Ste Marie, Ontario, is opening new toll lanes and upgrading its system with new software and new frequent user discounts. The International Bridge Authority (IBA) began opening the new lanes this week as part of a US$7 million project undertaken in coordination with the Mackinac Bridge Authority and the Michigan portion of the Blue Water Bridge in Port Huron. The toll software upgrades, which are necessary be
August 11, 2015 Read time: 2 mins
The Sault Ste Marie International Bridge, which connects Sault Ste Marie, Michigan, and Sault Ste Marie, Ontario, is opening new toll lanes and upgrading its system with new software and new frequent user discounts.

The International Bridge Authority (IBA) began opening the new lanes this week as part of a US$7 million project undertaken in coordination with the Mackinac Bridge Authority and the Michigan portion of the Blue Water Bridge in Port Huron.

The toll software upgrades, which are necessary because the current software is obsolete and will no longer be supported, will cost US$2.4 million over ten years.

The IBA’s toll system upgrade is also being coordinated with the larger US$8.9 million toll plaza reconstruction effort.

IBA officials expect all three permanent northbound lanes and two permanent southbound lanes to be fully functional by 12 August. The remaining two permanent southbound lanes are slated to go online in late September after the demolition of the old IBA administration building. When complete, the toll plaza will have four southbound and three northbound lanes.

Related Content

  • Countering truckers’ parking conundrum
    May 3, 2017
    Colin Sowman hears about a new truck parking information system being piloted across eight states. Legislation limits truck drivers’ hours with the result that they are often caught in a situation where they need to stop either for a break or an overnight rest. But as truck parking is in short supply, truck drivers spend an average of 56 minutes a day searching for available spaces and are often faced with the choice of driving beyond their permitted hours or parking illegally.
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • Kenya WIM system cuts four days off journey times
    March 18, 2014
    Shem Oirere looks at how weigh-in-motion is helping to streamline the trucking industry in Kenya. Kenya, East Africa’s largest economy, is streamlining trucking operations on its section of the 8,800km Northern Corridor. It is both reducing the number of weighbridges and automating the remaining ones in an effort to improve efficiency and eliminate corruption.The Northern Corridor is a major gateway through Kenya to the landlocked countries of Uganda, Rwanda, Burundi, Democratic Republic of Congo and Sou
  • Huawei opens door to new opportunities in transport & logistics
    December 18, 2024
    By addressing the four key elements of a transportation network’s composition with a state-of-the-art digital solution, Huawei is bringing significant performance uplifts to all aspects of railway operations