Skip to main content

Indra to upgrade toll road in Ireland

Celtic Roads Group (Dundalk) has awarded Indra a contract valued at US$4 million (€3.6 million) to renew the toll system on the M1 motorway in Ireland, which connects Dublin to the border of Northern Ireland. Indra upgraded the toll systems on this highway in 2004 and extended the systems to new high-speed roads in 2009. The company is also responsible for the maintenance of the systems. Under the new contract, Indra will upgrade the road infrastructure and the back-office system of the M1 mainline a
July 15, 2016 Read time: 2 mins
Celtic Roads Group (Dundalk) has awarded 509 Indra a contract valued at US$4 million (€3.6 million) to renew the toll system on the M1 motorway in Ireland, which connects Dublin to the border of Northern Ireland.

Indra upgraded the toll systems on this highway in 2004 and extended the systems to new high-speed roads in 2009. The company is also responsible for the maintenance of the systems.

Under the new contract, Indra will upgrade the road infrastructure and the back-office system of the M1 mainline and two ramp plazas to renew the technology in accordance with the standards issued by Transport Infrastructure Ireland. Electronic toll systems will be installed so that vehicles will be able to drive straight through at normal road speeds without stopping. The technology also includes manual payment systems with unattended payment systems equipped with convenient automatic machines that accept all payment types. The back-office system will manage the collection of payments and keep track of revenues easily and securely.

The works also involve maintaining the existing toll system and working closely with the operating with an option to extend to twelve years.

For more information on companies in this article

Related Content

  • IRD awarded Idaho weigh in motion contract
    March 22, 2016
    The Idaho Transportation Department (ITD) in the US has awarded International Road Dynamics (IRD) a US$2,623,703 contract to supply and install a two-sided mainline weigh-in-motion (WIM) and electronic pre-clearance system on Interstate 15 at the Inkom Port of Entry. The contract includes a two-year equipment, software, and database maintenance provision to commence upon completion of the system's installation. This system will weigh and measure commercial vehicles at highway speeds upstream of the weigh
  • Taking the long view of ITS
    March 24, 2015
    Caroline Visser believes the ITS industry must present a coherent case for consideration of the technology to become part of transport policy and planning. As ITS advisor and road finance director for the International Road Federation (IRF) in Geneva, Caroline Visser is well placed to evaluate quantifying the benefits of ITS implementation – a topic about which there is little agreement and even less consistency. She is pressing to get some consistency in the evaluation of ITS deployments through the use of
  • Major growth predicted for OEM embedded telematics
    September 5, 2014
    According to a new research report by Berg Insight, shipments of OEM embedded telematics systems worldwide are forecasted to grow from 8.4 million units in 2013 at a compound annual growth rate (CAGR) of 30.6 per cent to reach 54.5 million units in 2020. Moreover, Berg Insight forecasts that the number of cars sold worldwide equipped with head-units featuring handset-based telematics capabilities will grow from 7 million in 2013 to 68.5 million in 2020.
  • Big data bonus for Dublin’s buses
    August 19, 2014
    Dublin’s smart research partnership speeds buses More than 50% of people travelling into and across the Irish capital rely on public transport, and four out of 10 these use buses meaning Dublin Bus carries some 120 million passengers a year.