Skip to main content

Indra to upgrade Philippines toll system

Manila North Tollways Corporation (MNTC) has awarded Indra the design, supply, installation, and commissioning of the new toll control solution for its Subic-Clark-Tarlac Expressway (SCTEX) concession. The project includes the integration of the SCTEX toll control solution with that of the system that Indra recently implemented for the North Luzon Expressway (NLEX), the main motorway connecting the capital region of Metro Manila to the northern regions of the country. The contract, awarded in a consortium w
November 4, 2015 Read time: 2 mins
Manila North Tollways Corporation (MNTC) has awarded 509 Indra the design, supply, installation, and commissioning of the new toll control solution for its Subic-Clark-Tarlac Expressway (SCTEX) concession. The project includes the integration of the SCTEX toll control solution with that of the system that Indra recently implemented for the North Luzon Expressway (NLEX), the main motorway connecting the capital region of Metro Manila to the northern regions of the country. The contract, awarded in a consortium with Egis Philippines, is worth US$4.3 million to Indra and is due to be completed within a year.

The new contract includes a new control centre for the SCTEX highway, at 94 kilometres the longest in the Philippines, together with systems for 14 toll booths, 34 automatic entry lanes and 43 mixed payment lanes, fitted with toll and remote toll systems. With an increased variety of payment options, the system will be able to better adapt to specific needs of private cars as well as transportation companies, resulting to more efficient transactions at the tolls.

Using Indra technology will enable MNTC to operate the SCTEX and NLEX highways with the same platform, unifying the management of users, accounts, payment methods, back-office processes and fully integrating reports between the two systems. The platform will also facilitate the implementation of new payment methods, simplify processes and enable efficient adjustments to requirements or future integrations with other systems, thereby optimising costs.

Related Content

  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • August 17, 2017
    Indra to upgrade Delhi metro ticketing
    Spanish technology company Indra has is to deploy its contactless ticketing technology at 14 new stations on the Delhi and Noida Metro system. The US$5.2 million (€4.5 million) contract, awarded by the Delhi Metro Rail Corporation (DMRC) also includes the design, development, supply, installation and commissioning of all technology used for access control, validation, ticket sales and card top-ups at the six new stations on the blue line between Noida City Centre and Electronic City, as well as at eight
  • October 1, 2015
    TransCore to upgrade Delaware River bridge toll system
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.