Skip to main content

Indra implements ITS technology on Mexico’s Guadalajara-Tepic motorways

The leading road concessionaire in Mexico, Ideal, has awarded Spanish multinational Indra a US$21.67 million contract for implementing its technology in the three motorways that make up what is known as Mexico's South Pacific Package for the amount of €17 million. The project consists of implementing the ITS as well as the tolls and electronic tolls on the motorway that connects the cities of Tepic and Guadalajara, the second most important in Mexico, as well as in the beltways of both cities.
May 22, 2012 Read time: 2 mins
RSSThe leading road concessionaire in Mexico, Ideal, has awarded Spanish multinational 509 Indra a US$21.67 million contract for implementing its technology in the three motorways that make up what is known as Mexico's South Pacific Package for the amount of €17 million.

The project consists of implementing the ITS as well as the tolls and electronic tolls on the motorway that connects the cities of Tepic and Guadalajara, the second most important in Mexico, as well as in the beltways of both cities.

Indra's intelligent traffic control technology will allow centralised and flexible management and monitoring of the three motorways, facilitating operations in a predictive manner and also programming demand in real time. A single control centre will integrate the information from the various subsystems that each motorway will be equipped with: vehicle detection and recognition systems, variable signalling that will provide drivers with information in real time, closed circuit television (CCTV), a traffic data collection system, weather stations, SOS telephony, infraction detection systems and communications.

Indra will also implement its toll and electronic toll technology in a total of 17 toll plazas and 149 lanes for manual, automatic and electronic toll collection (ETC). The ETC system will allow users to pay using a TAG device installed in their vehicle without having to stop or reduce their speed. The information from the various subsystems installed in the toll system, such as signalling, vehicle recognition, billing, communications, a backoffice system and a customer service system, will also be integrated with the control centre.

The toll for the Guadalajara-Tepic motorway (186 km) is scheduled to begin operating at the end of 2012, while the Libramiento Guadalajara (111 km) and the Libramiento Tepic (30 km) tolls will be available approximately one year later.

For more information on companies in this article

Related Content

  • Integrating traffic systems improves management and control
    April 25, 2012
    Following a successful trial in 2007, VicRoads has adopted Streams Motorway Management from Transmax as its primary traffic management and control system Throughout the world, the avoidable social cost of traffic congestion continues to rise each year with increased motorisation, urbanisation and population growth. Traffic congestion is responsible for an increase in travel times, vehicle operating costs and carbon emissions. In 2007, VicRoads commissioned Streams Motorway Management for the M1 Monash Freew
  • Plug and play approach unifies workzone ITS
    July 18, 2012
    Caltrans District 7 is finalising a ConOps document which will detail a plug-and-play to work zone ITS operation. The organisation's Allen Z. Chen elaborates. Before August is out, on current planning, the California Department of Transportation (Caltrans) District 7 (which covers Los Angeles and Ventura Counties, with a combined population of close to 11 million people) intends to have finalised a Concept of Operations (ConOps) document dealing with Work Zone Transportation Management Systems (WZTMS). The
  • Puerto Rico deals
    April 19, 2012
    The authorities in Puerto Rico awarded a contract to a consortium for two toll roads under a 40 year deal. The joint venture partnership comprises Spanish firm Abertis and Goldman Sachs' GS Global Infrastructure Partners II. The deal concerns the 83km PR22 road and the 8km PR5 road. The PR22 link is a major route with up to 10 lanes at its widest point while the urban PR5 road runs from PR22 to the western suburbs of San Juan.
  • Cost saving multi-agency transportation and emergency management
    May 3, 2012
    Although the recession had dramatically reduced traffic volumes in the past few years, the economy was on the brink of a recovery that portended well for jobs but poorly for traffic congestion. Leaders of four government agencies in Houston, Texas, got together to discuss how to collectively cope with the expected increase in vehicles on the road. "They knew they couldn't pour enough concrete to solve the problem, and they also knew the old model of working in a vacuum as standalone entities would fail," sa