Skip to main content

Indra implements ITS technology on Mexico’s Guadalajara-Tepic motorways

The leading road concessionaire in Mexico, Ideal, has awarded Spanish multinational Indra a US$21.67 million contract for implementing its technology in the three motorways that make up what is known as Mexico's South Pacific Package for the amount of €17 million. The project consists of implementing the ITS as well as the tolls and electronic tolls on the motorway that connects the cities of Tepic and Guadalajara, the second most important in Mexico, as well as in the beltways of both cities.
May 22, 2012 Read time: 2 mins
RSSThe leading road concessionaire in Mexico, Ideal, has awarded Spanish multinational 509 Indra a US$21.67 million contract for implementing its technology in the three motorways that make up what is known as Mexico's South Pacific Package for the amount of €17 million.

The project consists of implementing the ITS as well as the tolls and electronic tolls on the motorway that connects the cities of Tepic and Guadalajara, the second most important in Mexico, as well as in the beltways of both cities.

Indra's intelligent traffic control technology will allow centralised and flexible management and monitoring of the three motorways, facilitating operations in a predictive manner and also programming demand in real time. A single control centre will integrate the information from the various subsystems that each motorway will be equipped with: vehicle detection and recognition systems, variable signalling that will provide drivers with information in real time, closed circuit television (CCTV), a traffic data collection system, weather stations, SOS telephony, infraction detection systems and communications.

Indra will also implement its toll and electronic toll technology in a total of 17 toll plazas and 149 lanes for manual, automatic and electronic toll collection (ETC). The ETC system will allow users to pay using a TAG device installed in their vehicle without having to stop or reduce their speed. The information from the various subsystems installed in the toll system, such as signalling, vehicle recognition, billing, communications, a backoffice system and a customer service system, will also be integrated with the control centre.

The toll for the Guadalajara-Tepic motorway (186 km) is scheduled to begin operating at the end of 2012, while the Libramiento Guadalajara (111 km) and the Libramiento Tepic (30 km) tolls will be available approximately one year later.

For more information on companies in this article

Related Content

  • Kapsch ‘opens the way’ to interoperability
    July 30, 2013
    Richard Turnock, chief technology officer of Kapsch TrafficCom North America explains what advantages its newly-opened TDM protocol can offer as a US-wide standard for tolling interoperability. The electronic tolling industry across the United States is evolving. Historically it was characterised by clusters of interoperability where a motorist may be able to use the same transponder across a large area, such as the 15-State E-ZPass system, or be confined to a single State system. Now, however, the industry
  • Developing a wireless cooperative traffic management system
    March 14, 2012
    The use by MDOT of 90-foot concrete poles on which to mount CCTV equipment reduces the number of poles needed to monitor a given area and incidences of occlusion
  • Kapsch and Autofind partner on vehicle tracking solutions
    April 28, 2014
    Kapsch TrafficCom and UHF Gen 2 RFID solutions supplier Autofind Industrial have formed a strategic partnership with the aim of jointly providing end-to-end solutions for SINIAV (Sistema de Identificação Automática de Veículos), Brazil’s national electronic vehicle registration program.
  • New York’s Hudson Bridge goes AET
    October 15, 2014
    New York’s Metropolitan Transportation Authority Bridges & Tunnels (MTA B&T) has selected TransCore to deploy the agency’s first all-electronic tolling (AET) system on the historic Henry Hudson Bridge. Built in 1936, the iconic bridge provides passage for more than 63,000 vehicles each day. The AET project is part of a three-year, US$33 million MTA B&T bridge rehabilitation project to replace the original 1930s steel supports as well as install 3,600 feet of new bridge decking, new energy-efficient roadw