Skip to main content

Indra implements ITS technology on Mexico’s Guadalajara-Tepic motorways

The leading road concessionaire in Mexico, Ideal, has awarded Spanish multinational Indra a US$21.67 million contract for implementing its technology in the three motorways that make up what is known as Mexico's South Pacific Package for the amount of €17 million. The project consists of implementing the ITS as well as the tolls and electronic tolls on the motorway that connects the cities of Tepic and Guadalajara, the second most important in Mexico, as well as in the beltways of both cities.
May 22, 2012 Read time: 2 mins
RSSThe leading road concessionaire in Mexico, Ideal, has awarded Spanish multinational 509 Indra a US$21.67 million contract for implementing its technology in the three motorways that make up what is known as Mexico's South Pacific Package for the amount of €17 million.

The project consists of implementing the ITS as well as the tolls and electronic tolls on the motorway that connects the cities of Tepic and Guadalajara, the second most important in Mexico, as well as in the beltways of both cities.

Indra's intelligent traffic control technology will allow centralised and flexible management and monitoring of the three motorways, facilitating operations in a predictive manner and also programming demand in real time. A single control centre will integrate the information from the various subsystems that each motorway will be equipped with: vehicle detection and recognition systems, variable signalling that will provide drivers with information in real time, closed circuit television (CCTV), a traffic data collection system, weather stations, SOS telephony, infraction detection systems and communications.

Indra will also implement its toll and electronic toll technology in a total of 17 toll plazas and 149 lanes for manual, automatic and electronic toll collection (ETC). The ETC system will allow users to pay using a TAG device installed in their vehicle without having to stop or reduce their speed. The information from the various subsystems installed in the toll system, such as signalling, vehicle recognition, billing, communications, a backoffice system and a customer service system, will also be integrated with the control centre.

The toll for the Guadalajara-Tepic motorway (186 km) is scheduled to begin operating at the end of 2012, while the Libramiento Guadalajara (111 km) and the Libramiento Tepic (30 km) tolls will be available approximately one year later.

Related Content

  • April 7, 2015
    Indra to implement Kuwait’s traffic monitoring system
    In a contract valued at around US$18 million, Indra is to implement a traffic monitoring system in Kuwait City on behalf of the Kuwait Municipality. The contract includes the technology for the traffic management centre, installation of over 200 permanent traffic sensors and gathering and integration of data from about 3,000 locations throughout the city within the new monitoring system, including integration of different vehicle detection technologies, with radar systems, loops, video cameras and weighing
  • October 5, 2016
    ITS boosts safety on Brazil’s Regis Bittencourt Highway
    Brazil’s incident-prone Regis Bittencourt Highway was once known as ‘the highway of death’ but investment in ITS systems has brought about some big improvements, as Mauro Nogarin discovers Between 2010 and the end of 2014, Brazil made major investments in traffic technology across its national highways with the result that the ITS network went from 4,963km of fibre optics to 8,524km and the number of cameras increased from 1,127 to 3,208.
  • March 22, 2012
    Indra to help improve public transport management in Wroclaw, Poland
    Indra, Spain’s leading IT multinational, has been awarded a contract with the Public Transportation Municipal Company in Wroclaw, which is the fourth largest city in Poland, to install its intelligent public transportation management technology for US$22.23 million and a one year execution period. Indra will install an operations assistance system (OAS) that includes passenger information subsystems, fleet management and video surveillance for 251 vehicles, 136 buses and 115 trams in the city. The OAS will
  • April 25, 2012
    TransCore wins three ITS contracts from Nevada DOT
    TransCore has won three separate contracts to provide ITS design, construction and integration services for the Nevada Department of Transportation. The projects include a 30-mile extension of the FAST traffic management system along I-15 from outside Las Vegas to the California border; a 15-mile expansion of the FAST traffic management system along I-515 on the eastern side of the Las Vegas metropolitan area; and a 10-mile segment of I-80 in Reno, Nevada, as part of a roadway reconstruction project.