Skip to main content

Indra implements ITS technology on Mexico’s Guadalajara-Tepic motorways

The leading road concessionaire in Mexico, Ideal, has awarded Spanish multinational Indra a US$21.67 million contract for implementing its technology in the three motorways that make up what is known as Mexico's South Pacific Package for the amount of €17 million. The project consists of implementing the ITS as well as the tolls and electronic tolls on the motorway that connects the cities of Tepic and Guadalajara, the second most important in Mexico, as well as in the beltways of both cities.
May 22, 2012 Read time: 2 mins
RSSThe leading road concessionaire in Mexico, Ideal, has awarded Spanish multinational 509 Indra a US$21.67 million contract for implementing its technology in the three motorways that make up what is known as Mexico's South Pacific Package for the amount of €17 million.

The project consists of implementing the ITS as well as the tolls and electronic tolls on the motorway that connects the cities of Tepic and Guadalajara, the second most important in Mexico, as well as in the beltways of both cities.

Indra's intelligent traffic control technology will allow centralised and flexible management and monitoring of the three motorways, facilitating operations in a predictive manner and also programming demand in real time. A single control centre will integrate the information from the various subsystems that each motorway will be equipped with: vehicle detection and recognition systems, variable signalling that will provide drivers with information in real time, closed circuit television (CCTV), a traffic data collection system, weather stations, SOS telephony, infraction detection systems and communications.

Indra will also implement its toll and electronic toll technology in a total of 17 toll plazas and 149 lanes for manual, automatic and electronic toll collection (ETC). The ETC system will allow users to pay using a TAG device installed in their vehicle without having to stop or reduce their speed. The information from the various subsystems installed in the toll system, such as signalling, vehicle recognition, billing, communications, a backoffice system and a customer service system, will also be integrated with the control centre.

The toll for the Guadalajara-Tepic motorway (186 km) is scheduled to begin operating at the end of 2012, while the Libramiento Guadalajara (111 km) and the Libramiento Tepic (30 km) tolls will be available approximately one year later.

For more information on companies in this article

Related Content

  • 3D detection innovation
    February 3, 2012
    Canadian company Leddar Tech has announced what it says is the industry's first and only optical detection and ranging product based on the time-of-flight principle. The company says the patent-pending solution provides unique advantages and benefits for optimising traffic management.
  • Q-Free exhibits LCC550 universal parking controller
    March 24, 2014
    Norwegian company Q-Free is positioning itself as a total ITS systems provider and the fruits of its labours are showcased here at Intertraffic. Visitors can see how the acquisitions of TCS and Elcom are leading to seamless advanced transportation management solutions which integrate parking management and intersection control into a coherent offering from a single supplier.
  • Rosa Rountree calls for clarity and consistency
    December 16, 2015
    Rosa Rountree campaigns for accurate and consistent figures for the tendering of tolling concessions. If there is one thing about which Rosa Rountree is passionate, it’s numbers. That’s not surprising for a graduate accountant, but it is not only the quarterly accounts that concern the CEO and president of Egis Projects USA.
  • Mexico City seeks solutions to improve air quality
    December 6, 2017
    David Crawford ponders prospects for one of the world’s most congested and polluted cities. In 1992, the United Nations named Mexico City as the world’s most polluted urban centre. In the first half of 2016, following the updating of pollution alert limits to meet international standards, Mexico recorded 115 days where ozone concentrations exceeded the acute exposure health limit.