Skip to main content

Humber Bridge toll goes ORT

Civil engineering firm Britcon has completed works for a new US$8.8 million state-of-the-art toll collection facility on the Humber Bridge to replace the toll collection system which was installed in 1981. The new collection system will include one of the first open road tolling arrangement to be installed in the UK, where vehicles do not need to stop while driving through the toll plaza. Britcon undertook full infrastructure works for the project on behalf of Sociedad Ibérica de Construcciones Eléctrica
October 17, 2014 Read time: 2 mins
Civil engineering firm Britcon has completed works for a new US$8.8 million state-of-the-art toll collection facility on the Humber Bridge to replace the toll collection system which was installed in 1981. The new collection system will include one of the first open road tolling arrangement to be installed in the UK, where vehicles do not need to stop while driving through the toll plaza.

Britcon undertook full infrastructure works for the project on behalf of Sociedad Ibérica de Construcciones Eléctricas (6770 SICE), a leading specialist consulting with the Humber Bridge Board on intelligent transport and environmental control systems. SICE is now progressing installation of the electronics and expects to complete the entire project by summer 2015.

Britcon was contracted to manage the decommissioning of the existing toll provision, supply and install a temporary toll system during the construction process and design and construct the new facility in its entirety. This included major alterations to the existing highway and open road toll lanes, construction of the toll plaza housing structures and collection system equipment.

The new facility will also reduce the number of booths from the existing six, to three in each direction with automatic barriers. The system uses the RFID-based 'HumberTag' that is read each time the customer passes through the toll booths, allowing them to drive straight through without interruption.

Britcon managing director, Paul Clarkson, said, “The existing toll collection system was installed in 1981 and as such the technology was becoming obsolete and high maintenance.

"The new and innovative collection system includes one of the first open-road tolling arrangements to be installed in the UK, where vehicles do not need to stop while driving through the toll plaza. They are billed through electronic methods via tags tied to a Humber Bridge toll account.”

For more information on companies in this article

Related Content

  • Jenoptik supplies sophisticated multi-section control project
    November 17, 2014
    Efficient speed enforcement in the most highly frequented tunnel in Austria on the A7 near Linz. The Bindermichl-Niedernhart tunnel complex on Austrian highway A7 connects the major east/west A1 route from Vienna/ Bratislava to Munich/Salzburg with the A7/ E55 running south from Prague in the Czech Republic. This happens right in the middle of the city of Linz, Austria.
  • Ferrovial consortium to build I-77 HOT lanes
    June 30, 2014
    Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol
  • Transport technology transforming bus stops in Los Angeles
    January 20, 2012
    David Crawford reports on a pioneering blend of transport technology and aesthetic By gaining a design award before installation has even started, the US$6.9 million City of Santa Monica (California)'s Big Blue Bus Shelter and Branding Package has ensured early interest among what it expects to be a new wave of transit riders. The American Institute of Architects' Los Angeles chapter's recently conferred 'Next LA Citation Award for Architecture', given for design excellence in projects as yet unbuilt, comm
  • Consortium named for Pennsylvania PPP bridge project
    January 27, 2015
    A consortium comprising HDR, Plenary Group, Walsh Group and Granite Construction Company has been awarded the contract to replace 558 bridges as part of the Pennsylvania Rapid Bridge Replacement Project in the US. As lead design engineer for the construction joint venture, HDR will be responsible for bridge and roadway design services, environmental permits, right-of-way plan development and construction phase services. The team will begin construction in summer 2015 and complete all bridge replaceme