Skip to main content

Humber Bridge toll goes ORT

Civil engineering firm Britcon has completed works for a new US$8.8 million state-of-the-art toll collection facility on the Humber Bridge to replace the toll collection system which was installed in 1981. The new collection system will include one of the first open road tolling arrangement to be installed in the UK, where vehicles do not need to stop while driving through the toll plaza. Britcon undertook full infrastructure works for the project on behalf of Sociedad Ibérica de Construcciones Eléctrica
October 17, 2014 Read time: 2 mins
Civil engineering firm Britcon has completed works for a new US$8.8 million state-of-the-art toll collection facility on the Humber Bridge to replace the toll collection system which was installed in 1981. The new collection system will include one of the first open road tolling arrangement to be installed in the UK, where vehicles do not need to stop while driving through the toll plaza.

Britcon undertook full infrastructure works for the project on behalf of Sociedad Ibérica de Construcciones Eléctricas (6770 SICE), a leading specialist consulting with the Humber Bridge Board on intelligent transport and environmental control systems. SICE is now progressing installation of the electronics and expects to complete the entire project by summer 2015.

Britcon was contracted to manage the decommissioning of the existing toll provision, supply and install a temporary toll system during the construction process and design and construct the new facility in its entirety. This included major alterations to the existing highway and open road toll lanes, construction of the toll plaza housing structures and collection system equipment.

The new facility will also reduce the number of booths from the existing six, to three in each direction with automatic barriers. The system uses the RFID-based 'HumberTag' that is read each time the customer passes through the toll booths, allowing them to drive straight through without interruption.

Britcon managing director, Paul Clarkson, said, “The existing toll collection system was installed in 1981 and as such the technology was becoming obsolete and high maintenance.

"The new and innovative collection system includes one of the first open-road tolling arrangements to be installed in the UK, where vehicles do not need to stop while driving through the toll plaza. They are billed through electronic methods via tags tied to a Humber Bridge toll account.”

For more information on companies in this article

Related Content

  • Paris metro world first inaugurated today
    March 23, 2012
    Pierre Mongin, chairman and CEO of RATP has today inaugurated the commissioning of the first automatic trains on Line 1 of the Paris metro in the presence of Nathalie Kosciusko-Morizet, minister for ecology, sustainable development, transportation and housing and Jean-Paul Huchon, president of the regional council of Île-de-France.
  • Easy Péage for car rental from Verra Mobility
    July 7, 2020
    US firm says this is Europe’s first automatic contactless toll payment option
  • Sao Paulo gets first free flow toll system
    August 7, 2013
    Brazilian highway concessionaire Renovias has rolled out the first free-flow tolling system in Sao Paulo, Brazil, enabling vehicles to travel at constant speeds along the freeway and enjoy a reduction in travel times. Schneider Electric installed its SmartMobility free-flow toll system, designed to handle electronic toll collection without vehicles having to stop in order to make toll payment. The system also provides vehicle detection via its simultaneous double tag reading system and front and rear licenc
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in