Skip to main content

FTA disappointed at Dartford free-flow toll delay

‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th
September 22, 2014 Read time: 4 mins
‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the 6983 Freight Transport Association (FTA).  The Association has voiced its concern in response to the announcement by the 503 Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks.
 
Originally planned to be in place by the 28 October 2014, the HA has now said that the system will now not be ready to use until late November.
 
Malcolm Bingham, FTA’s head of Road Network Management Policy said: “This is disappointing news that the free-flow tolling at Dartford is now to be delayed – the costs of this hold-up are unacceptable to the freight industry. FTA has been asking for a long time for this system to be introduced as this is the appropriate way forward in order to reduce a good deal of administration costs for the freight industry in dealing with tolls, charges and queues at the crossing.”
 
FTA has previously expressed support of the free-flow system, saying that ‘it would be good news for the freight industry’ within its response to the 1837 Department for Transport consultation on the proposals to revise the road charging regime.  On behalf of its members, the Association stated that freight operators have always maintained that the toll plazas themselves cause the majority of the congestion at the crossing.  According to FTA figures, at present it already costs an estimated £1 per minute per HGV in running costs to queue at the Dartford tolls.
 
The free-flow technology will allow motorists to use the crossing without having to stop at barriers to hand over payment, and instead they will be able to pay through a variety of methods including telephone, text message, online and at retail outlets, giving drivers greater flexibility in how and when they pay the charge.
 
Bingham added: “However, we need to be sure that the system will work, and it is therefore vital that they get it right.   FTA has and will continue to work with the Highways Agency to help get a resolution to this issue as soon as possible.”

According to the HA, the full benefits of the scheme will be delivered by the end of April 2015, when all changes to the road layout will be completed. The website, systems and infrastructure needed to operate these new arrangements have been installed and are currently being tested to ensure that they operate reliably and are easy to use.

The timetable will ensure that drivers have enough notice to prepare for the changes and that the system is fully tested before it is introduced.

Highways Agency project leader Nigel Gray said: “Dart Charge is a massive change for drivers using the Dartford Crossing and it’s only right that it is thoroughly tested before being introduced.

“We want to help drivers to be ready for the improvements we’re making at the Crossing. That’s why we are saying today that Dart Charge will start during late November.  We can reassure drivers that we’ll give them plenty of notice before the changes are introduced. They will have considerable time to sign up for a pre-pay account, which for most will be the easiest and cheapest way to pay the charge – with discounts of up to a third on every crossing.”

Until Dart Charge goes live, the current payment arrangements for the road user charge at the Crossing will continue - cash at the Crossing, through a DART-Tag or local residents account.

Related Content

  • December 6, 2013
    Pilot for 50 mph limit for HGVs on A9
    Scottish transport minister Keith Brown has announced plans for a 50 mph heavy goods vehicle (HGV) pilot to be introduced at the same time as average speed cameras on Scotland’s A9 road. The trial, which aims to improve the safety and operational performance the route, will go ahead next year alongside a safe driving campaign run by the haulage industry and the A9 Safety Group. In advance of the pilot, the Road Haulage Association will step up their efforts to ensure lorry drivers adhere to safe drivi
  • December 14, 2016
    FTA concerns addressed in Government response on all-lane running
    The UK Freight Transport Association (FTA) is pleased its concerns about management and signalling on smart motorways have been addressed in the Government’s response to a Transport Select Committee report published this week. FTA raised its concerns with Highways England on Red X compliance and proper management of the signal systems on smart motorways. The Government has responded to the Transport Select Committee’s report on all-lane running, highlighting these concerns. Smart motorways use tech
  • April 30, 2014
    FTA, BMW support UK government funding for green cars
    The UK government has announced plans to invest US$840 million ultra-low emission vehicle industry. It is hoped that this will help drivers both afford and feel confident about using electric cars. Announcing the funding during a visit to the Transport Research Laboratory, Nick Clegg, Deputy Prime Minister said: “Owning an electric car is no longer a dream or an inconvenience. Manufacturers are turning to this new technology to help motorists make their everyday journeys green and clean.”
  • October 22, 2014
    HGV speed limit pilot given the seal of approval
    The legislation to allow heavy goods vehicles (HGVs) to travel at 50mph on sections of single carriageway on the A9 between Perth and Inverness in Scotland has been signed and will come into force at the same time as the average speed camera system on the route becomes operational – 28 October. The pilot, which was approved by the Scottish Parliament earlier this year, will help to improve journey times and also driver behaviour, by reducing frustration, queue lengths and journey times for HGVs. Trans