Skip to main content

FTA disappointed at Dartford free-flow toll delay

‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th
September 22, 2014 Read time: 4 mins
‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the 6983 Freight Transport Association (FTA).  The Association has voiced its concern in response to the announcement by the 503 Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks.
 
Originally planned to be in place by the 28 October 2014, the HA has now said that the system will now not be ready to use until late November.
 
Malcolm Bingham, FTA’s head of Road Network Management Policy said: “This is disappointing news that the free-flow tolling at Dartford is now to be delayed – the costs of this hold-up are unacceptable to the freight industry. FTA has been asking for a long time for this system to be introduced as this is the appropriate way forward in order to reduce a good deal of administration costs for the freight industry in dealing with tolls, charges and queues at the crossing.”
 
FTA has previously expressed support of the free-flow system, saying that ‘it would be good news for the freight industry’ within its response to the 1837 Department for Transport consultation on the proposals to revise the road charging regime.  On behalf of its members, the Association stated that freight operators have always maintained that the toll plazas themselves cause the majority of the congestion at the crossing.  According to FTA figures, at present it already costs an estimated £1 per minute per HGV in running costs to queue at the Dartford tolls.
 
The free-flow technology will allow motorists to use the crossing without having to stop at barriers to hand over payment, and instead they will be able to pay through a variety of methods including telephone, text message, online and at retail outlets, giving drivers greater flexibility in how and when they pay the charge.
 
Bingham added: “However, we need to be sure that the system will work, and it is therefore vital that they get it right.   FTA has and will continue to work with the Highways Agency to help get a resolution to this issue as soon as possible.”

According to the HA, the full benefits of the scheme will be delivered by the end of April 2015, when all changes to the road layout will be completed. The website, systems and infrastructure needed to operate these new arrangements have been installed and are currently being tested to ensure that they operate reliably and are easy to use.

The timetable will ensure that drivers have enough notice to prepare for the changes and that the system is fully tested before it is introduced.

Highways Agency project leader Nigel Gray said: “Dart Charge is a massive change for drivers using the Dartford Crossing and it’s only right that it is thoroughly tested before being introduced.

“We want to help drivers to be ready for the improvements we’re making at the Crossing. That’s why we are saying today that Dart Charge will start during late November.  We can reassure drivers that we’ll give them plenty of notice before the changes are introduced. They will have considerable time to sign up for a pre-pay account, which for most will be the easiest and cheapest way to pay the charge – with discounts of up to a third on every crossing.”

Until Dart Charge goes live, the current payment arrangements for the road user charge at the Crossing will continue - cash at the Crossing, through a DART-Tag or local residents account.

For more information on companies in this article

Related Content

  • Rosa Rountree calls for clarity and consistency
    December 16, 2015
    Rosa Rountree campaigns for accurate and consistent figures for the tendering of tolling concessions. If there is one thing about which Rosa Rountree is passionate, it’s numbers. That’s not surprising for a graduate accountant, but it is not only the quarterly accounts that concern the CEO and president of Egis Projects USA.
  • Emovis wins 10-year Mont Blanc free-flow deal
    December 12, 2024
    Tolling system will cover 58km of A40 in France’s Haute-Savoie region
  • What does 2023 have in store for ITS?
    December 30, 2022
    From VRUs to EVs, from customer experience to connected vehicles, here are some thoughts...
  • Developments in toll interoperability
    July 16, 2012
    The North Carolina Turnpike Authority's JJ Eden talks about developments within the Alliance for Toll Interoperability. The Alliance for Toll Interoperability grew out of the US State of North Carolina's moves to introduce modern, Open Road Tolling (ORT) and the identification of revenue 'holes' when it came to out-of-state customers. Initially, the Alliance looked to achieve some form of common ground when it came to the use of transponders used by different agencies but alighted on video-based tolling as