Skip to main content

FTA calls for greater reliability on road network following improvements at Dartford

Drivers using the Dartford Crossing at peak times are saving around an hour and a half every week thanks to Dart Charge, according to Highways England. New figures released by Highways England show that journeys over the Dartford Crossing, which cost £62million (US$95 million) to convert to free-flow tolling, are up to 56 per cent faster than before payment barriers were removed. Drivers at peak times save up to 14 minutes southbound and seven minutes northbound.
October 14, 2015 Read time: 3 mins
FTA calls for greater reliability on road network following improvements at Dartford

Drivers using the Dartford Crossing at peak times are saving around an hour and a half every week thanks to Dart Charge, according to 8101 Highways England.

New figures released by Highways England show that journeys over the Dartford Crossing, which cost £62million (US$95 million) to convert to free-flow tolling, are up to 56 per cent faster than before payment barriers were removed. Drivers at peak times save up to 14 minutes southbound and seven minutes northbound.

Spread across the day, the average time savings are seven and a half minutes southbound and three and a half minutes northbound. The improvements have been achieved despite traffic volumes at the crossing growing by around 4 per cent, with up to 157,000 crossings being made every day in July, around 20,000 over the Crossing’s design capacity.

Dart Charge project director Nigel Gray said: “Relieving congestion and speeding up journeys at the Dartford Crossing is what Dart Charge is all about. These really encouraging figures show what a difference Dart Charge is making for drivers. Drivers commuting from Essex in to Kent are saving around 20 minutes a day, and others commuting from Kent to Essex are saving more than 15 minutes a day. We still have more work to do, working with partners to ensure that all the approaches to the tunnels in Kent are working as well as they possibly can. But I hope that these figures will reassure people that the improvements are real and that Dart Charge is working.”

Following publication of the data, the 6983 Freight Transport Association says it has bigger concerns regarding overall journey reliability. It has called on the Government and highway authorities for greater reliability on the road network through better infrastructure and control of routes such as smart motorways which increase flow reliability.
 
The freight industry judges journey times based on experience and by using route planning software, calculating the transport cost based on distance and time.  However, problems arise when incidents occur and the network fails, causing interruptions to journeys.  That is something the industry cannot predict and ends up being a cost that has to be absorbed as it cannot be planned for when contracts are drawn up.  FTA has calculated the cost of delays to transport operators equates to £1 for every minute an HGV sits in traffic.
 
Malcolm Bingham, FTA’s head of Road Network Management Policy, said: “If an HGV uses the Dartford Crossing several times in a day that would mean a time saving, possibly enabling drivers to travel further before having to take a statutory rest break in accordance with drivers’ hours rules.  However it is hard to see what is meaningfully gained by vehicles on cross-Channel journeys which are only likely to gain a few minutes for that journey on just one day.”
 
FTA has supported the improvements at Dartford in terms of the benefits they have delivered for drivers, however the Association says that they are only a short-term fix and another crossing of the Thames must be planned for and built in order to cope with future demand.

For more information on companies in this article

Related Content

  • Detection analysis technology successfully predicts traffic flows
    February 3, 2012
    David Crawford investigates new detection analysis technology from IBM. Locations on both the East and West Coasts of the US are scheduled for early deployments of IBM's new Traffic Prediction Tool (TPT) statistical analysis model for the fine-time resolution and near-term prediction of road flow conditions. Developed by IBM's Watson Research Laboratories, TPT is designed to analyse data from the the key detection indicators - average vehicle volumes and speeds passing a location in a given time interval -
  • How safe are smart motorways?
    March 3, 2020
    A valiant attempt to ease the UK’s congested strategic road system? Or an idea that should never have seen the light of day? Alan Dron reports on the controversy over smart motorways...
  • Solar studs a cost-effective alternative to street lighting?
    July 30, 2012
    Road traffic accidents have an enormous impact on society in terms of human loss, pain and suffering and a significant cost to the economy, the individual and their families. Accident rates on South Africa's roads are among the highest in the world and cost the country in the region of $163 million each year. The former head of the Department of Transport (DoT), Dr Kwazi Mbanjwa, described the situation as "carnage on our roads", with over 500,000 accidents and 10,000 fatalities per annum and the number of
  • NGV Network calls on new metro mayors to tackle air pollution
    May 18, 2017
    The Natural Gas Vehicle Network (NGVN) has called on the newly elected mayors of UK combined authorities to make tackling air pollution central to their work in the coming three years. It says the new mayors in the West Midlands, Greater Manchester, the Liverpool City Region, the Tees Valley, the West of England and Cambridgeshire could play a vital role in this effort by bringing various stakeholders together with a common goal: improving their regions’ air for the good of all of their residents. Recognisi