Skip to main content

Free-flow tolls for new £2bn Thames crossing

More than 27 million drivers annually may use the planned Lower Thames Crossing near London
By David Arminas November 16, 2020 Read time: 2 mins
Artist’s impression of the Lower Thames Crossing’s northern tunnel entrance in the county of Essex, looking south (image: Highways England)

Highways England’s planned £2 billion Lower Thames Crossing will have a free-flow charging system, similar to that of the nearby Dartford Crossing.

Highways England has just tendered for what will be the government-owned agency’s largest-ever contract that will include Britain’s longest road tunnel, a 4.2km-long twin tunnel under the River Thames, east of London.

There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The existing Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure.

In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much-needed relief at Dartford.

The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. 

Work could start in early 2022, according to Highways England, which is responsible for modernising, maintaining and operating England’s motorways and major A roads. 

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2/M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. 

“The scheme will relieve congestion at the Dartford Crossing by providing a new free-flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
Keith Bowers, tunnels and systems director for the Lower Thames Crossing, added: “We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers.”
 

Related Content

  • April 17, 2024
    Welcome to Digital, Free Flow Tolling
    Emovis’ work in the Netherlands demonstrates many benefits of free flow tolling as Benoît Rossi, director of business development at Emovis, an Abertis-owned entity, highlights
  • November 10, 2014
    M25 upgraded to ‘smart’ motorway
    Road users on the vast majority of the UK’s M25 will benefit from four-lane capacity now that the final section between junctions 25 and 27 has become a smart motorway. The road has been upgraded from three to four lanes in each direction, with the hard shoulder converted for use as a permanent traffic lane and enhanced on-road technology to manage traffic flow to improve the reliability of journey times, providing a boost for businesses and the wider economy.
  • November 23, 2016
    New partnership aims to make roads safer for motorcyclists
    Highways England, the company responsible for running over 4000 miles of England’s motorways and major trunk roads, is to become the third partner in a collaboration to improve motorcycle rider safety. The government-owned company will join the National Police Chiefs’ Council (NPCC) and the Motorcycle Industry Association (MCIA) as an equal partner in facilitating practical changes to roads, as detailed in a jointly written whitepaper: Realising the Motorcycling Opportunity: A Motorcycle Safety and Trans
  • January 25, 2021
    Highways England tests ghost busters
    Getting rid of misleading or confusing road markings will be vital for safe AV operation