Skip to main content

Free-flow tolls for new £2bn Thames crossing

More than 27 million drivers annually may use the planned Lower Thames Crossing near London
By David Arminas November 16, 2020 Read time: 2 mins
Artist’s impression of the Lower Thames Crossing’s northern tunnel entrance in the county of Essex, looking south (image: Highways England)

Highways England’s planned £2 billion Lower Thames Crossing will have a free-flow charging system, similar to that of the nearby Dartford Crossing.

Highways England has just tendered for what will be the government-owned agency’s largest-ever contract that will include Britain’s longest road tunnel, a 4.2km-long twin tunnel under the River Thames, east of London.

There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The existing Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure.

In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much-needed relief at Dartford.

The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. 

Work could start in early 2022, according to Highways England, which is responsible for modernising, maintaining and operating England’s motorways and major A roads. 

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2/M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. 

“The scheme will relieve congestion at the Dartford Crossing by providing a new free-flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
Keith Bowers, tunnels and systems director for the Lower Thames Crossing, added: “We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers.”
 

For more information on companies in this article

Related Content

  • Moveble barriers improve workzone safety, reduce costs
    January 25, 2012
    Two phases of an arterial reconstruction project in Salt Lake City have provided a compelling cost-based argument for moveable barriers.
  • Transportation hub the centre of sustainable urban development
    November 21, 2012
    A marriage of transit, technology and culture is taking shape in Minneapolis, with ITS systems vital to hopes for a sustainable development centred on a hub of public transportation. Construction started in July this year on ‘The Interchange’ – a station in the Midwest US city of Minneapolis claimed as the most spectacular expression yet of the fast-spreading North American concept of transit-oriented development (TOD). Due for completion in 2014, the Interchange is designed as a multi-modal public transpor
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • IRF Geneva leads UN road safety meeting
    October 5, 2022
    The International Road Federation (IRF) in Geneva convened key industry leaders to discuss “Action for Road Safety: Private Sector Leadership” on the occasion of the UN High Level Meeting on Global Road Safety hosted in New York