Skip to main content

Free-flow tolls for new £2bn Thames crossing

More than 27 million drivers annually may use the planned Lower Thames Crossing near London
By David Arminas November 16, 2020 Read time: 2 mins
Artist’s impression of the Lower Thames Crossing’s northern tunnel entrance in the county of Essex, looking south (image: Highways England)

Highways England’s planned £2 billion Lower Thames Crossing will have a free-flow charging system, similar to that of the nearby Dartford Crossing.

Highways England has just tendered for what will be the government-owned agency’s largest-ever contract that will include Britain’s longest road tunnel, a 4.2km-long twin tunnel under the River Thames, east of London.

There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The existing Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure.

In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much-needed relief at Dartford.

The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. 

Work could start in early 2022, according to Highways England, which is responsible for modernising, maintaining and operating England’s motorways and major A roads. 

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2/M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. 

“The scheme will relieve congestion at the Dartford Crossing by providing a new free-flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
Keith Bowers, tunnels and systems director for the Lower Thames Crossing, added: “We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers.”
 

Related Content

  • February 6, 2015
    HGVs without safety equipment to be banned from London
    Britain’s first Safer Lorry Scheme, a London-wide ban on any lorry not fitted with safety equipment to protect cyclists and pedestrians, has been given the go ahead by the mayor, Transport for London (TfL) and London Councils. The scheme received 90 per cent support in a public consultation Traffic orders implementing the scheme are currently being published. Installation of road signs at the London boundary, training of police officers and information campaigns with drivers and hauliers have all started
  • February 6, 2015
    HGVs without safety equipment to be banned from London
    Britain’s first Safer Lorry Scheme, a London-wide ban on any lorry not fitted with safety equipment to protect cyclists and pedestrians, has been given the go ahead by the mayor, Transport for London (TfL) and London Councils. The scheme received 90 per cent support in a public consultation Traffic orders implementing the scheme are currently being published. Installation of road signs at the London boundary, training of police officers and information campaigns with drivers and hauliers have all started
  • April 25, 2016
    Traffic signal upgrade for UK’s south-east
    A contract to deliver a new central traffic signal control and management system for the UK’s south east has been placed by Highways England with Simulation Systems (SSL) to meet both the immediate and future requirements of Highways England for England’s motorway and major A-roads. Central to the contract will be Siemens Stratos cloud-hosted, fully integrated traffic control and management solution and hosted-SCOOT, the real time UTC and adaptive traffic control system already used to manage and co-ordinat
  • January 20, 2012
    Tags or communication based toll payment systems?
    Midland Expressway Ltd's Tom Fanning discusses deployment of Near Field Communicationbased payment on the M6 Toll facility The M6 Toll's introduction from early next year of Near Field Communication (NFC) is a pragmatic response to the relative scarcity of tolled facilities and the concomitant low levels of tag take-up in the UK, according to the road's operator, Midland Expressway Ltd (MEL). Nevertheless, Dedicated Short-Range Communication (DSRC)-based tags operating at 5.8GHz are still a key part of the