Skip to main content

Free-flow tolls for new £2bn Thames crossing

More than 27 million drivers annually may use the planned Lower Thames Crossing near London
By David Arminas November 16, 2020 Read time: 2 mins
Artist’s impression of the Lower Thames Crossing’s northern tunnel entrance in the county of Essex, looking south (image: Highways England)

Highways England’s planned £2 billion Lower Thames Crossing will have a free-flow charging system, similar to that of the nearby Dartford Crossing.

Highways England has just tendered for what will be the government-owned agency’s largest-ever contract that will include Britain’s longest road tunnel, a 4.2km-long twin tunnel under the River Thames, east of London.

There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The existing Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure.

In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much-needed relief at Dartford.

The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. 

Work could start in early 2022, according to Highways England, which is responsible for modernising, maintaining and operating England’s motorways and major A roads. 

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2/M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. 

“The scheme will relieve congestion at the Dartford Crossing by providing a new free-flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
Keith Bowers, tunnels and systems director for the Lower Thames Crossing, added: “We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers.”
 

Related Content

  • September 28, 2012
    Clearview Traffic shortlisted for two Highways Excellence Awards
    Clearview Traffic Group has been shortlisted in two different categories for the Highways Magazine Excellence Awards 2012, with two diverse road delineation projects. In the Road Marking Project of the Year category, the company has been chosen as a finalist for its dynamic delineation project for the Hindhead Tunnel in Surrey, UK, where Clearview installed 868 Astucia IRS2 hardwired bi-directional road studs in a project initiated by the Highways Agency (HA) in 2007 to remove a major source of congestion a
  • May 31, 2013
    Temporary traffic monitoring with Bluetooth and wi-fi
    David Crawford reviews developments in temporary ITS. Widespread take-up of technologies such as Bluetooth and wi-fi are encouraging the emergence of more sophisticated, while still cost effective, ITS responses to the traffic issues posed by temporary road situations such as work zones and special events. Andy Graham of traffic solutions specialists White Willow Consulting says: “A machine-to-machine radio link is far easier and cheaper than reading characters on a plate.” There can be other plusses. Tech
  • January 23, 2012
    Tunnel simulators vital for real world tunnel management
    Guillaume Ponsar, tunnel safety engineer with Egis Road Operation, writes about the advantages to be gained from the use of tunnel simulators. Major tunnel disasters over the last decade and more have shown how swiftly and badly a simple crash or fire may evolve should the wrong actions be taken by control room operators or traffic managers. Global safety issues and the reactions of operations staff have now become the principal concerns for Operations and Maintenance (O&M) service providers. As a result, n
  • December 9, 2016
    Four drivers a month deliberately ignore Manchester motorway closures
    Highways England is urging drivers Highways England is not to put road workers’ lives at risk by deliberately ignoring road closures on the M60 and M62 near Manchester. New figures have revealed that four drivers a month are entering closed sections of road in the Manchester smart motorway scheme to either overtake traffic on the motorway or avoid using diversion routes. Highways England has released CCTV footage showing a driver ignoring an overnight slip road closure at junction 11 of the M60 at Ecc