Skip to main content

Free-flow tolls for new £2bn Thames crossing

More than 27 million drivers annually may use the planned Lower Thames Crossing near London
By David Arminas November 16, 2020 Read time: 2 mins
Artist’s impression of the Lower Thames Crossing’s northern tunnel entrance in the county of Essex, looking south (image: Highways England)

Highways England’s planned £2 billion Lower Thames Crossing will have a free-flow charging system, similar to that of the nearby Dartford Crossing.

Highways England has just tendered for what will be the government-owned agency’s largest-ever contract that will include Britain’s longest road tunnel, a 4.2km-long twin tunnel under the River Thames, east of London.

There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The existing Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure.

In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much-needed relief at Dartford.

The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. 

Work could start in early 2022, according to Highways England, which is responsible for modernising, maintaining and operating England’s motorways and major A roads. 

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2/M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. 

“The scheme will relieve congestion at the Dartford Crossing by providing a new free-flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
Keith Bowers, tunnels and systems director for the Lower Thames Crossing, added: “We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers.”
 

For more information on companies in this article

Related Content

  • Chile opts for Q-Free’s free flow tolling
    August 25, 2015
    Q-Free is to supply its single gantry multi lane free flow tolling system to Sociedad Concesionaria Vespucio Norte Express, Chile. The order, valued at around US$4 million, is for the design and installation of the renewal of an existing electronic toll collection system in Santiago and includes an initial three-year service and maintenance period, which the customer has the option to renew for a further seven years. Delivery is due to be completed by the end of 2017. “We are pleased to receive this o
  • German authorities use CB-radio message to reduce accidents in roadworks
    April 8, 2014
    Citizen Band radio is proving useful to prevent accidents in Germany’s roadworks. In common with other German Länder (federal regions) with large volumes of commercial vehicles using their trunk road networks, Bavaria had been experiencing high levels of road traffic accidents (RTAs) involving heavy trucks in the vicinity of minor motorway maintenance sites. This was despite the extensive visual warning regulations published in the German federal road safety audit (RSA) guidelines for the protection of site
  • Key airport link open in US
    May 17, 2012
    The new Richmond Airport connector link road is now open to traffic. The link provides a direct connection from the Pocahontas 895 highway to Richmond International Airport and cuts journey time on this route. This 2.5km road is an extension of the Pocahontas 895 highway and links directly to Airport Drive at Charles City Road. The new road can save drivers around 10 minutes or more on a trip to the airport, especially those coming from Chesterfield County and the Tri-Cities area. Customers using the Airpor
  • ITS World Congress 2021: making it real
    August 17, 2021
    ITS World Congress 2021 will be held in Hamburg, Germany, in October, and will focus on showcasing the reality of ITS innovations now, says organiser Ertico-ITS Europe