Skip to main content

Free-flow tolls for new £2bn Thames crossing

More than 27 million drivers annually may use the planned Lower Thames Crossing near London
By David Arminas November 16, 2020 Read time: 2 mins
Artist’s impression of the Lower Thames Crossing’s northern tunnel entrance in the county of Essex, looking south (image: Highways England)

Highways England’s planned £2 billion Lower Thames Crossing will have a free-flow charging system, similar to that of the nearby Dartford Crossing.

Highways England has just tendered for what will be the government-owned agency’s largest-ever contract that will include Britain’s longest road tunnel, a 4.2km-long twin tunnel under the River Thames, east of London.

There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The existing Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure.

In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much-needed relief at Dartford.

The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. 

Work could start in early 2022, according to Highways England, which is responsible for modernising, maintaining and operating England’s motorways and major A roads. 

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2/M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. 

“The scheme will relieve congestion at the Dartford Crossing by providing a new free-flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
Keith Bowers, tunnels and systems director for the Lower Thames Crossing, added: “We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers.”
 

For more information on companies in this article

Related Content

  • Thales to upgrade four London Underground lines
    August 4, 2015
    French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
  • Free-flow toll systems lower operational risks says road operator
    April 23, 2015
    Multi-lane free-flow toll systems lower the operational risk of highway concessions, according to toll road operator Renovias Concessionária, which implemented the first such system in Brazil. "Operational risk is lower than manned toll booths as no workers are needed," Renovias maintenance manager Michell Costa told BNamericas. The system in place on São Paulo state highway SP340 detects the electronic fee collection tags in vehicles using both 5.8GHz and 915MHz frequencies, and captures front and re
  • Brake calls for action as road casualty figures rise
    February 3, 2017
    Brake, the UK road safety charity, is calling on the government to take action to reduce the numbers killed and seriously injured on Britain’s roads. In recent years road safety policy has been diminished by a lack of interest, urgency and resources, the consequences of which are becoming increasingly apparent as our road casualty figures begin to rise. Brake is calling on the government to act now to uphold its commitment to zero road deaths and injuries on the road. Road casualty figures just released
  • Vehicle probe data aids emergency rescue vehicle routing
    June 20, 2012
    A new vehicle routeing initiative has arisen to help improve emergency response and relief following natural disasters in Japan. David Crawford reports Japan’s national ITS group ITS Japan and the country’s leading automotives have agreed on a new combined approach to the organisation of traffic management and emergency response in the wake of major natural disasters. A new, robust traffic information platform using probe data obtained from vehicles to support traffic flow will build on the shared experienc