Skip to main content

Free-flow tolls for new £2bn Thames crossing

More than 27 million drivers annually may use the planned Lower Thames Crossing near London
By David Arminas November 16, 2020 Read time: 2 mins
Artist’s impression of the Lower Thames Crossing’s northern tunnel entrance in the county of Essex, looking south (image: Highways England)

Highways England’s planned £2 billion Lower Thames Crossing will have a free-flow charging system, similar to that of the nearby Dartford Crossing.

Highways England has just tendered for what will be the government-owned agency’s largest-ever contract that will include Britain’s longest road tunnel, a 4.2km-long twin tunnel under the River Thames, east of London.

There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The existing Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure.

In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much-needed relief at Dartford.

The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. 

Work could start in early 2022, according to Highways England, which is responsible for modernising, maintaining and operating England’s motorways and major A roads. 

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2/M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. 

“The scheme will relieve congestion at the Dartford Crossing by providing a new free-flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
Keith Bowers, tunnels and systems director for the Lower Thames Crossing, added: “We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers.”
 

For more information on companies in this article

Related Content

  • Centralised traffic control, managing changing traffic demands
    January 23, 2012
    Paul van Koningsbruggen and Dave Marples of Technolution BV describe, using a national example from the Netherlands, how smart add-ons to traffic control centres combine to increase cross-centre capabilities and cost-efficiency. Increasingly, traffic management is becoming the natural partner of the civil engineer, improving flows over existing infrastructure to deliver an alternative to laying more blacktop. As in any emerging market, the first steps towards mature traffic management have not necessarily r
  • Mobike suspends bike-sharing operations in Manchester, UK
    September 10, 2018
    Mobike says it has suspended its bike-sharing service in the UK city of Manchester following an increase in bike losses from theft and vandalism. The company is in the process of refunding riders and is advising them to check their bank statements. According to Mobike, the service began operating in Manchester in July 2017, with citizens taking 250,000 trips across over 180,000 miles. It operates in other UK cities such as London, Newcastle, Oxford and Cambridge. Mobike also has operations in Paris, Berlin
  • Waze to warn drivers at rail crossings
    September 30, 2020
    US rail operator Norfolk Southern targets areas with 'history of vehicle-train incidents'
  • Turas to manage free-flow transactions in Dublin
    April 26, 2019
    Turas, a joint venture comprising Vinci Highways and business process management provider Abtran, is to manage free-flow transactions services in Dublin, Ireland. The 11-year contract, valued at £321 million, is for the Irish capital’s ring road (M50 motorway) as part of an agreement with state agency Transport Infrastructure Ireland (TII). Vinci, a subsidiary of Vinci Concessions, and Abtran will combine resources to deliver a service which covers the technology, systems and operations to support free-fl