Skip to main content

Free-flow tolls for new £2bn Thames crossing

More than 27 million drivers annually may use the planned Lower Thames Crossing near London
By David Arminas November 16, 2020 Read time: 2 mins
Artist’s impression of the Lower Thames Crossing’s northern tunnel entrance in the county of Essex, looking south (image: Highways England)

Highways England’s planned £2 billion Lower Thames Crossing will have a free-flow charging system, similar to that of the nearby Dartford Crossing.

Highways England has just tendered for what will be the government-owned agency’s largest-ever contract that will include Britain’s longest road tunnel, a 4.2km-long twin tunnel under the River Thames, east of London.

There will also be traffic regulation measures that include prohibiting use by pedestrians, low-powered motorcycles, cyclists, horse riders and agricultural vehicles.

The existing Dartford Crossing, which was designed for 135,000 vehicles a day, often sees 180,000 a day. It also can take three to five hours for the roads to clear following a closure.

In its first year, more than 27 million drivers are forecast to use the Lower Thames Crossing, providing much-needed relief at Dartford.

The Crossing will improve journeys by almost doubling road capacity across the Thames River, thanks to 23km of new road of three lanes in both directions. 

Work could start in early 2022, according to Highways England, which is responsible for modernising, maintaining and operating England’s motorways and major A roads. 

At 16m wide, the tunnels - one for southbound traffic, the other for northbound traffic - will be some of the largest bored tunnels in the world, says the agency. The scope also includes portal buildings, approach roads and the tunnel systems.

The agency said that it expects that three applicants will be shortlisted to move forward into a competitive dialogue stage.

The tunnels and approaches contract is the first of the three main works contacts for the scheme. Following this deal will be the Roads North and the A2/M2 contracts which are expected to be announced early next year.

“The Lower Thames Crossing is the most ambitious road project this country has seen since the M25 was completed nearly 35 years ago,” said Matt Palmer, executive director of Lower Thames Crossing. 

“The scheme will relieve congestion at the Dartford Crossing by providing a new free-flowing road, almost doubling road capacity across the Thames and supporting sustainable local and regional economic growth.”
 
Keith Bowers, tunnels and systems director for the Lower Thames Crossing, added: “We have committed to targets that mean by 2040 nobody will be killed or seriously injured on our roads and motorways and we need our contractors’ design and delivery to meet that target for our road users and workers.”
 

For more information on companies in this article

Related Content

  • UK road safety’ is stagnating’ – IAM and RoSPA call for new strategy
    July 1, 2016
    Independent road safety charity IAM RoadSmart and safety charity the Royal Society for the Prevention of Accidents (RoSPA) have called for government action following the release of the Department for Transport’s (DfT) reported road casualties in Great Britain 2015. The 2015 figures show there were 1,732 reported road deaths – two per cent fewer compared with 2014. According to the DfT, this is the second lowest annual total on record after 2013. The number of people seriously injured in reported road tr
  • Cycling in London grows by ten per cent
    February 2, 2015
    London’s cycling revolution accelerated last year, with 2014 seeing new records for usage of the capital’s cycle hire scheme and overall cycling on the Transport for London (TfL) road network. Across the TfL road network, London’s main roads, cycling levels in quarter 3 of 2014/15 (14 September to 6 December) were ten per cent higher than in the same quarter the previous year and the highest since records began in 2000. It was the fifth record quarter in a row. By the end of 2014/15, TfL forecasts a 12 p
  • Covid turns tolls cashless
    December 23, 2021
    When coronavirus hit, Pennsylvania Turnpike Commission made its long-planned e-tolling system permanent; this made sense, but it was still a difficult decision, explains the organisation’s Carl DeFebo