Skip to main content

Fitch: Smooth ride so far for US managed lanes

Managed lanes throughout the US are off to a good start in 2017, according to Fitch Ratings in its latest managed lanes peer review. Actual performance is so far exceeding Fitch’s rating case for the sector as a whole, with 95 Express in Northern Virginia and NTE (segments 1 and 2) in Texas proving to be notable examples. Also boosting long-term prospects for managed lanes is the performance on the longest operating facility, SR-91 in Orange County, California. This state road is seeing strong compound a
March 9, 2017 Read time: 2 mins
Managed lanes throughout the US are off to a good start in 2017, according to Fitch Ratings in its latest managed lanes peer review.

Actual performance is so far exceeding Fitch’s rating case for the sector as a whole, with 95 Express in Northern Virginia and NTE (segments 1 and 2) in Texas proving to be notable examples. Also boosting long-term prospects for managed lanes is the performance on the longest operating facility, SR-91 in Orange County, California. This state road is seeing strong compound annual growth rate (CAGR) post initial ramp-up despite numerous adverse developments.

According to Fitch, SR-91 did see moderate softening during the most recent recession coupled with multiple free capacity expansions. Long term revenue growth CAGR is six per cent despite volatility and expansion plus the roadway’s ‘land-bridge’ configuration has helped drive demand. Many of the projects will eventually link into managed lanes networks and it is still uncertain how performance will be impacted as such networks develop.

High occupancy vehicle (HOV) policy and other policies governing free access to managed lanes remains an essential component of Fitch’s analysis. Free access policies have their pros and cons, with policies for HOVs with two or more passengers (HOV2) proving to be problematic over time as non-tolled vehicles crowd out paying drivers. As such, some policies will need to change for all users to share both the costs and benefits of the managed lanes.

Taking these uncertainties into account, the Rating Outlooks for the vast majority of Fitch’s rated managed lanes is Stable. Fitch recently revised the Rating Outlook for 95 Express to Positive from Stable. Broadly speaking, however, Fitch does not envision rating changes in the near term with 10 out of 11 projects in various stages of construction or ramp up.

Related Content

  • March 23, 2015
    I-80 Smart Corridor sets the ITS standard for California's Bay Area
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • March 23, 2015
    I-80 Smart Corridor sets the ITS standard for California's Bay Area
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • October 28, 2019
    Free pass shake-up on Virginia's HOV lanes
    The US state of Virginia has radically changed which cars are eligible to use high-occupancy vehicle (HOV) lanes.
  • August 14, 2012
    TÜV Rheinland to provide support for UAT for Virginia’s 495 Express Lanes
    TÜV Rheinland’s ITS group has been selected to provide user acceptance testing (UAT) support for the 495 Express Lanes, the new high-occupancy toll (HOT) lanes opening on the Virginia side of the I-495/Capital Beltway at the end of this year. The project is one of the largest transportation endeavours in the US, aiming to ease traffic on one of the country’s most congested corridors and UAT is a key testing component of the project that will involve testing all aspects of the Express Lanes tolling hardware