Skip to main content

First phase of Houston reversible HOV to HOT lanes completed

Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilization of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135kms
June 19, 2012 Read time: 2 mins
Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor 139 Transcore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilization of the HOV system and subsequently relieve congestion in the general purpose freeway lanes.

When completed, the programme will span 135kms throughout Houston, the fourth largest city in the United States and the largest city in Texas. The IH-45 South Gulf Freeway is the first corridor in Metro’s HOV network to undergo the transformation with construction of the remaining US 59 South, IH-45 North, US 290 and US 59 North corridors to be completed by the end of 2012.

The HOT lanes will now be reversed from the inbound to outbound direction using a new automated reversible gate operation (ARGO) system that was deployed as part of the conversion effort. The ARGO system is an industry first of-its-kind and size, allowing Metro to remotely monitor and efficiently control access and egress throughout the entire HOT network from the area’s multi-agency traffic management centre, 61 Houston Transtar.

In addition to serving as the prime contractor for the system design and installation of the HOT and ARGO systems, TransCore is also contracted to provide turnkey lane, roadway, and back office operation and maintenance services for the two systems over the next six years.

For more information on companies in this article

Related Content

  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • CTS applies 'Netflix model' to MaaS
    January 29, 2021
    Umo travel solutions include multimodal app and fare collection platform
  • Indiana to issue major toll procurement tender
    October 22, 2013
    Indiana state agencies have begun procurement of toll systems covering some thirty lanes on three bridges over the Ohio River in the Louisville, Kentucky/southern Indiana metro area. Indiana Finance Authority (IFA) is procuring a toll system provider (TSP) to supply and install in-road loops or other vehicle detection, tracking and vehicle classification and cameras, together with a back office system, customer service centre and violations processing system and centre, along with operation and maintena
  • Caltrans takes the long view of transport
    October 21, 2016
    Caltrans’ Malcolm Dougherty took time out of his schedule at ITS America 2016 in San Jose to talk to ITS International about current and future challenges. As director of California Department of Transportation (Caltrans) since mid-2012, many would say that Malcolm Dougherty has one of the best jobs in transportation. Caltrans is one of the most progressive and innovative transport authorities, implementing policies to encourage cycling, piloting new