Skip to main content

Ferrovial consortium to build I-77 HOT lanes

Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol
June 30, 2014 Read time: 2 mins
5428 Cintra, a US subsidiary of Spanish infrastructure firm 4419 Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the 4775 North Carolina Department of Transportation (NCDOT).

The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy toll (HOT) lanes in both directions, providing traffic congestion relief to rapidly growing communities in the area.

Construction will be led by a joint venture between Ferrovial Agroman and W.C. English. The project is being developed as a public-private partnership with the private sector assuming traffic performance risk traditionally taken by the state.

The project is divided into three sections. The project’s 2.2 mile southern section and the 14.9 mile central section will have an ultimate configuration of two HOT lanes in each direction. The north section of the project includes 8.8 miles of new construction of one HOT lane in each direction.

“Cintra is pleased to be a provider of effective, efficient and much-needed transportation solutions and economic development in the greater Charlotte region and will continue to work with state and local leaders to deliver traffic congestion relief to regional motorists,” said Nicolas Rubio, US president of Cintra.

Construction is expected to begin by early 2015 and be completed in mid-2018. The term of the concession will be 50 years after the project opens to traffic.

For more information on companies in this article

Related Content

  • Consortium selected for Maryland LRT project
    March 3, 2016
    The Purple Line Transit Partner consortium, comprising Fluor Enterprises, Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA). Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties. The U
  • Canadian JV to build next phase of Ontario BRT
    September 30, 2015
    Metrolinx and York Region Rapid Transit Corporation (YRRTC) today announced the award of a US$248 million contract to the EDCO joint venture to design, build and finance the next phase of the dedicated York Viva Bus Rapid Transit rapidways along the Highway 7 transit corridor Southern Ontario, Canada. This initiative is part of the York Viva BRT project which represents a US$1 billion transit investment from the Government of Ontario and is part of Metrolinx's 25-year Regional Transportation Plan for an
  • Fix 66 group advocates for I-66 HOT Lanes
    July 9, 2015
    A new group called Fix 66 has been formed to advocate for a managed lanes and bus rapid transit system in the I-66 corridor, outside of the Capital Beltway, by maximising private sector investment and minimising potential impacts to its communities, businesses and commuters during construction. Anthony Bedell, a lifelong Fairfax County resident, local political leader and former official of the US Department of Labour and US Small Business Administration, says he is starting the Fix 66 group to give a vo
  • TransCore develops nearly 100 miles of express lanes in Dallas/Fort Worth
    November 8, 2016
    TransCore is in the midst of deploying over 100 miles of express lanes throughout the Dallas/Fort Worth Metroplex, as part of an initiative to increase mobility along the region’s busiest corridors. With 34 lanes already operational, the Texas Department of Transportation (TxDOT) plans to mark the 100-mile milestone by the end of 2018.