Skip to main content

Ferrovial consortium to build I-77 HOT lanes

Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol
June 30, 2014 Read time: 2 mins
5428 Cintra, a US subsidiary of Spanish infrastructure firm 4419 Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the 4775 North Carolina Department of Transportation (NCDOT).

The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy toll (HOT) lanes in both directions, providing traffic congestion relief to rapidly growing communities in the area.

Construction will be led by a joint venture between Ferrovial Agroman and W.C. English. The project is being developed as a public-private partnership with the private sector assuming traffic performance risk traditionally taken by the state.

The project is divided into three sections. The project’s 2.2 mile southern section and the 14.9 mile central section will have an ultimate configuration of two HOT lanes in each direction. The north section of the project includes 8.8 miles of new construction of one HOT lane in each direction.

“Cintra is pleased to be a provider of effective, efficient and much-needed transportation solutions and economic development in the greater Charlotte region and will continue to work with state and local leaders to deliver traffic congestion relief to regional motorists,” said Nicolas Rubio, US president of Cintra.

Construction is expected to begin by early 2015 and be completed in mid-2018. The term of the concession will be 50 years after the project opens to traffic.

Related Content

  • September 10, 2014
    FDOT to rebuild major segment of I-4
    US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y
  • June 6, 2024
    Indra chooses Q-Free for North Carolina express lane project
    NCDoT and NCTA are behind I-485 Express Lane Roadside Toll Collection System
  • August 8, 2012
    Construction begins on $1 billion I-95 Express Lanes in Northern Virginia
    Surrounded by elected officials, transportation engineers, and dignitaries, Virginia Governor Bob McDonnell held a groundbreaking ceremony yesterday to begin construction of the I-95 Express Lanes in Northern Virginia. The project will build 29 miles (46.7kms) of express lanes on I-95 from Garrisonville Road in Stafford County to Edsall Road in Fairfax County, and will connect the I-95 Express Lanes to the I-495 Express Lanes currently under construction to provide a seamless network of new lanes to reduce
  • June 2, 2014
    Developer selected for Dallas Airport freeway project
    Traffic relief is on the way for North Texas motorists who rely on SH 183, the airport freeway in Dallas and Tarrant counties. The Texas Transportation Commission has awarded a contract to Southgate Mobility Partners to develop much-needed improvements on up to 28 miles of roadway. Listed in the Texas Department of Transportation's 100 Most Congested Roadways, segments of SH 183 are used by nearly 170,000 vehicles daily.