Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • Stocchi takes on transatlantic tolling tasks
    March 20, 2017
    We talk to Emanuela Stocchi, the first overseas-based female president of IBTTA and well placed to view tolling on both sides of the Atlantic. As incoming president of the International Bridge, Tunnel and Turnpike Association (IBTTA), Emanuela Stocchi aims to bolster the ‘international, mobility and connections’ elements of the US-based tolling organisation.
  • University of Michigan wins Transportation Technology Tournament
    July 25, 2019
    A team from the University of Michigan has won the Transportation Technology Tournament for designing a solution to reduce congestion on two interstate highways in the Detroit area. The team presented their solution, Corridor Management in the I-75/I-696 Influence Area, to a panel of judges during a tournament which took place during the Institute of Transportation Engineers annual meeting in Austin, Texas. It focused on mitigating heavy, peak hour traffic volume on I-75 between Detroit and Troy, as
  • Stop thinking and act on cooperative infrastructures
    February 2, 2012
    OmniAir's Tim McGuckin looks at why metropolitan transportation networks might be the key to securing the long-term funding of cooperative infrastructure
  • Telvent to implement tolling system in three Washington State projects
    July 24, 2012
    Telvent GIT has been selected by the Washington State Department of Transportation (WSDoT) to implement tolling systems through the Washington State Roadway Toll Systems Project. The project includes the implementation, maintenance and operation of three all-electronic tolling systems in the Puget Sound area: the SR-99 bored tunnel in Seattle scheduled to open in 2015, the new SR 520 floating bridge targeted to open in 2014, and the planned I-405 express toll lanes between Bellevue and Lynnwood.