Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • Indra to renew Colombia toll systems
    March 2, 2016
    Concesionaria del Desarrollo Vial de la Sabana (DEVISAB) has awarded Indra a contract valued at US$2.3 million to renovate the technology used at three toll plazas and a control centre on a roadway linking the municipalities of Chia, Mosquera, Girardot and Soacha. The project is scheduled to be completed in 14 months. Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane, along a 159-kilometre stretch of
  • Efkon wins six new ITS contracts in India
    May 23, 2012
    Austrian company Efkon has announced that its Efkon India subsidiary has won six prestigious ITS projects, worth a total of US$12.65 million, in the last five months. The Jaypee Group has awarded the company a follow-up contract for a turnkey solution for the expressway traffic management and speed enforcement systems for the Yamuna expressway in the south of New Delhi. Efkon is providing a single interface solution for all the sub-systems which enables information capture of all expressway activities and c
  • Will interoperability prevent progress?
    January 10, 2014
    David Crawford examines the political and industrial background to the tolling technology debate. Saving the US State of California ‘millions of dollars’ in tolling infrastructure costs by encouraging new technologies is the professed aim of a legislative Bill, SB 242, which is currently moving through the State’s Senate (upper house) process. According to its sponsor, Republican State Senator Mark Wyland, permitting alternatives to the current FasTrak-branded radio-frequency identification (RFID)-based sys
  • From gas tax to road pricing
    March 18, 2020
    Robert W. Poole of the Reason Foundation thinks that trust is going to be essential if US states are to transition from gas tax to road pricing.