Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • Adaptive control reduces travel time, cuts congestion
    January 20, 2012
    Situated in San Diego County, California, the growing city of San Marcos has seen its population increase by 53.5 per cent since the turn of the century. Although this dramatic population increase has spurred economic growth bringing new business, homes and opportunities to the city, it has also increased traffic congestion along its central corridor, San Marcos Boulevard. This became the most congested arterial in the city, and, by 2006, the second-most travelled corridor in San Diego County.
  • Impact of US economic stimulus programme on ITS industry
    August 2, 2012
    Pete Goldin reports on the public sector perspective in this second article exploring the impact of the US economic stimulus programme on the domestic ITS industry The American Recovery and Reinvestment Act (ARRA) was enacted in February 2009 to help stimulate the US economy in the face of global recession. Of measures worth a nominal total of $787 billion, the US Department of Transportation (USDOT) received just over $48 billion with which to promote short-term economic recovery and an additional $1.5 bil
  • America explores road user charging options
    November 14, 2017
    Jack Opiola casts an eye over the numerous road user charging pilots underway in the US. In the USA, congestion mitigation and improving mobility have often focused on network improvements, increased road capacity, improved public transport, high-occupancy toll (HOT) lanes or ‘express lanes’ and ITS measures – all of which require political capital and major funding. Nowadays, political capital is as hard to obtain as funding because more political leaders are recognising the decline of fuel excise tax
  • America explores road user charging options
    November 27, 2017
    Jack Opiola casts an eye over the numerous road user charging pilots underway in the US. In the USA, congestion mitigation and improving mobility have often focused on network improvements, increased road capacity, improved public transport, high-occupancy toll (HOT) lanes or ‘express lanes’ and ITS measures – all of which require political capital and major funding. Nowadays, political capital is as hard to obtain as funding because more political leaders are recognising the decline of fuel excise tax in