Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • Developing Mexico's ITS standards and infrastructure
    February 28, 2013
    Promoting open market conditions for ITS deployment remains a major part of Mexico’s recent infrastructure modernization program. Travis P Dunn, partner at D’Artagnan Consulting, looks at the progress so far. In the past six years, Mexico has embarked on an ambitious infrastructure modernization program, calling for the construction and improvement of more than 19,000km of road infrastructure and the deployment of advanced technologies that improve safety, efficiency, and convenience for road users. One of
  • EU releases funds for key TEN-T projects
    November 30, 2012
    The European Commission has launched two Calls for Proposals under the 2012 Trans-European Transport Network (TEN-T) multi-annual and annual programmes, making over US1.5 billion available to finance European transport infrastructure projects in all transport modes – air, rail, road, and maritime/inland waterways – plus logistics and intelligent transport systems, in all EU Member States. Commission Vice President Siim Kallas, responsible for transport, said: "In making this considerable amount of funding a
  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
  • Tolling agencies build resilience into highway operations
    August 6, 2013
    IBTTA executive director and CEO Patrick D. Jones looks at tolling’s resilience in an increasingly unpredictable and cash-strapped world. Turbulent times call for transportation agencies to move smarter. That’s why resilience and preparedness have become watchwords in every aspect of tollway operations. From having the financial resources to invest in construction, maintenance and roadway operations, to having up-to-date emergency plans and social media strategies to cope with severe weather, tolling agenci