Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • TransCore wins three ITS contracts from Nevada DOT
    April 25, 2012
    TransCore has won three separate contracts to provide ITS design, construction and integration services for the Nevada Department of Transportation. The projects include a 30-mile extension of the FAST traffic management system along I-15 from outside Las Vegas to the California border; a 15-mile expansion of the FAST traffic management system along I-515 on the eastern side of the Las Vegas metropolitan area; and a 10-mile segment of I-80 in Reno, Nevada, as part of a roadway reconstruction project.
  • IBTTA, ARBTA, ATFI comment on latest Grow America Act
    April 2, 2015
    The International Bridge, Toll and Turnpike Association (IBTTA) has applauded the Grow America Act 2.0 just released by the US Administration and US DOT. It says that once again, the Administration has boldly called for lifting the ban on Interstate tolling for the purpose of reconstruction, giving states greater flexibility to meet their challenging infrastructure and surface transportation needs. The six-year, US$478 is said to be US$126 billion more than current investment levels and US$238 billion mo
  • Atkins named lead designer for major freeway project in Nevada
    December 14, 2015
    Atkins North America is to play a key role in the development of a freeway that aims to boost safety, mobility and accessibility in Las Vegas. Considered the most important and ambitious project in Nevada Department of Transportation's (NDOT) history, it also accommodates regional economic redevelopment through improved access to downtown Las Vegas and the Resort Corridor. As design lead on the team led by Kiewit Infrastructure West, Atkins will manage all design and engineering services for NDOT’s Pr
  • Orange County awards Iteris traffic signal synchronisation contract
    July 8, 2015
    Iteris is to carry out upgrades to traffic signal infrastructure and signal timing improvements along an eight-mile stretch of a major corridor spanning three California cities: Santa Ana, Costa Mesa, and Newport Beach under a US$2.1 million contract awarded by the Orange County Transportation Authority (OCTA). Under the project agreement, Iteris will design and implement traffic signal electronics and fibre-optic communications equipment, and will synchronise all 45 traffic lights along the entire Brist