Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • Ohio kicks off US$2.5 billion highway construction season
    April 11, 2014
    The Ohio government recently outlined the scope of the 2014 highway construction projects to be financed with funds borrowed against future Ohio Turnpike tolls. In total, 936 projects are planned at an estimated cost of US$2.5 billion. Planned projects include the widening of a section of I-75, a three-year project expected to cost about US$260 million, plus a US$28 million reconstruction of part of I-75, US$31 million in improvements to I-475/US 23 in Toledo's western suburbs, and the US$18 million McCo
  • Ohio Turnpike infrastructure project funds
    September 17, 2013
    The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike. The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.
  • Florida plans new ITS network
    October 9, 2013
    The Florida Department of Transportation (FDOT) is to begin work on a US$24 million intelligent transportation system (ITS) network in north-west Florida. The network will include 183 traffic cameras, 17 overhead message signs, 135 microwave vehicle detectors, 40 travel time sensors, three road and weather information sensors and eight highway advisory radios.
  • Managed lanes – the riddle wrapped up in an enigma
    December 15, 2014
    Managed lanes have something of a patchy track record and can pose authorities problems as well as solutions. Many authorities in the US and beyond have converted, or are converting, parts of the highway network into ‘Managed Lanes’ and charging motorists a fee to avoid the delays on the adjoining free use lanes. Some authorities have converted underused High Occupancy Vehicle (HOV) lanes into priced-managed high occupancy/toll lanes (HOT lanes) whereby the price charged can vary depending on a number of fa