Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • Parsons Selected for I-95/LPGA Boulevard Interchange Improvement in Florida
    February 22, 2017
    Parsons has been selected by the Florida Department of Transportation, District 5, to carry out an interchange analysis for the conceptual layout and ultimate reconfiguration of the I-95 interchange with LPGA Boulevard in Volusia County, Florida. Upon completion of the analysis and selection of the interchange configuration, Parsons will also perform final design services. The interchange is a crucial access point during morning and evening rush-hour traffic in the area, where traffic and congestion are
  • Figures show Express Lanes bring wider benefits
    August 12, 2015
    Drivers in the Washington DC area are realising time savings following the opening of Express Lanes on the I-95 - and not only those paying to use the new facility. Washington is ranked as being the worst gridlocked city in the United States. Every day its drivers face an average commute time of 39.5 minutes and they waste an average of 67 hours every year just sitting in traffic. In a move to counter these problems, late last December new Express Lanes were opened along 46.6km (29 miles) of the I-95 betwee
  • World Economic Forum report: how to accelerate infrastructure delivery
    May 20, 2014
    A new report from the World Economic Forum, Accelerating Infrastructure Delivery: New Evidence from International Financial Institutions, examines how the experience of international financial institutions (IFIs) can help bridge the growing infrastructure deficit. To accelerate economic growth, global levels of installed infrastructure, which currently stand at around US$45 trillion, need to grow to nearly US$100 trillion by 2030. To achieve this, governments need to increase public sector spending as a
  • Transition to all electronic tolling leads to cost savings
    February 2, 2012
    How a temporary congestion-relief solution resulted in the North Texas Tollway Authority's transition to all-electronic toll collection and potential savings of up to $472 million by 2045. By Carla Kienast, ETC Corporation