Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • Engineering firm unveils I-70 improvement project
    July 29, 2013
    International engineering firm Parsons Corp has unveiled its proposed US$3.5 billion project to ease traffic on Interstate 70 through the central mountains in Eagle County, Colorado. Parsons had submitted an unsolicited proposal to Colorado Department of Transportation in 2011. The three-phase project would include tolled express lanes and a bus rapid transit system and be completed as soon as 2021. The express lanes would be reversible to accommodate peak traffic flows to and from the mountains. The proje
  • Kapsch preferred bidder on Ohio River Bridges toll project
    March 13, 2015
    The Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project. Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value. Kapsch TrafficCom's proposal estimate was US$41.5
  • Florida takes the lead in advancing multistate tolling interoperability
    February 13, 2015
    Florida is one step closer to meeting national mandate for interoperability, with the announcement that the Florida Department of Transportation has entered into an agreement with Neology, a subsidiary of SMARTRAC Technology Group, for the patents associated with specific licensed products that offer the 6C protocol for electronic toll collection (ETC). “The licence provided through the agreement with Neology allows the Department to implement a variety of strategies to provide toll collection services,”
  • IntelliDrive and HOT lanes - the next generation?
    January 30, 2012
    Janet Banner, Metropolitan Transportation Commission, and Christopher Hill, Mixon Hill, Inc., outline efforts to explore the use of IntelliDrive technologies in HOT lane applications. On 21 October last year more than 100 transportation professionals came together for a workshop, either in person or via a webinar, to discuss the potential role of IntelliDriveSM technologies in enhancing the operations of High-Occupancy Toll (HOT) lanes. The discussions focused on a White Paper, commissioned by the Metropoli