Skip to main content

EU electronic toll service has fallen behind schedule

According to a recent report by the European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met. The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires me
September 10, 2012 Read time: 2 mins
According to a recent report by the 1690 European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met.

The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires member states to open their tolling systems to commercial EETS providers. EETS must be available to all vehicle categories by October 2014.

The report blames incomplete national transposition of the required rules in most member states. There has also been a delay in the necessary investment in both the systems and the resting required by toll chargers.

In response to the report, the Commission has published a warning that it will launch infringement proceedings against member states that fail to meet their obligations to roll out the service. But it also lays out possible assistance the Commission could offer to help speed up the roll-out, including financial assistance for interoperability projects between member states, under the trans-European transport programme.

For more information on companies in this article

Related Content

  • Satellite based goods vehicle tracking comes a step closer
    March 15, 2012
    A project aimed at proving the viability of satellite-based goods tracking in Europe has come to a close – establishing everything necessary for commercial services to flourish. A landmark stage was reached in tracking of goods across Europe in December last year, with conclusion of the Scutum project – ‘Securing the EU GNSS adoption in transport of dangerous materials’. This has validated the accuracy and reliability of the European Geostationary Navigation Overlay Service (EGNOS) for goods tracking and se
  • London more than twice over air pollution limit, says ClientEarth
    October 14, 2019
    Greater London is more than twice over the legal limit for air pollution levels in the UK, according to a study. Charity ClientEarth says the UK is failing to meet the legal limits of nitrogen dioxide pollution, where the annual average concentration level is 40µg/m3 (micrograms per cubic metre of air). Findings show London’s annual mean concentration of 89 µg/m3 is followed by South Wales (62 µg/m3), West Midlands Urban Area (58 µg/m3), Glasgow Urban Area (58 µg/m3) and Tyneside (54 µg/m3). The study f
  • The great pay divide
    April 2, 2014
    Public acceptance is crucial for the acceptance of managed and express lanes as Jon Masters discovers. Lists of proposed highway expansion projects introducing variably priced toll lanes continue to lengthen. Managed lanes, or express lanes to some, are gaining support as a politically favourable way of adding capacity and reducing acute congestion on principal highways. In Florida, for example, the managed lanes on the 95 Express are claimed to have significantly increased average peak-time speeds on tolle
  • Smart phones offer smarter way to pay for travel
    December 16, 2013
    David Crawford reviews developments in near field communications for mass transit payments. ‘A carefully-designed and well-implemented mobile near field communications (NFC) solutions can give passengers a compelling experience that will encourage them to make greater use of public transport.’ That was the confident conclusion of a recent joint White Paper drawn up by the International Association of Public Transport and the global mobile operators’ representative group GSMA.