Skip to main content

EU electronic toll service has fallen behind schedule

According to a recent report by the European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met. The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires me
September 10, 2012 Read time: 2 mins
According to a recent report by the 1690 European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met.

The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires member states to open their tolling systems to commercial EETS providers. EETS must be available to all vehicle categories by October 2014.

The report blames incomplete national transposition of the required rules in most member states. There has also been a delay in the necessary investment in both the systems and the resting required by toll chargers.

In response to the report, the Commission has published a warning that it will launch infringement proceedings against member states that fail to meet their obligations to roll out the service. But it also lays out possible assistance the Commission could offer to help speed up the roll-out, including financial assistance for interoperability projects between member states, under the trans-European transport programme.

For more information on companies in this article

Related Content

  • EU Transport Commissioner encourages cross-border cooperation
    May 25, 2016
    Opening the 2016 General Assembly of the European Innovation Partnership (EIP) on Smart Cities and Communities (EIP SCC) which aims to improve urban life through more sustainable integrated solutions in transport, energy and ICT sectors, European Transport Commissioner Violeta Bulc challenged cities and companies to cooperate across borders, to accelerate and scale investment. She said: "Cleaner air, safer transport networks, reducing congestion, optimising use of existing infrastructure – these are just
  • Interoperability facilitates mobility on Santiago’s toll roads
    August 10, 2016
    Drivers crossing Chile’s capital are benefitting from additional investment in ITS. Mauro Nogarin reports. Santiago de Chile is pioneering the development of concession-interoperable, multi-lane, free-flow urban highways. This road network crosses the city from north to south (Autopista Central), from east to west (Costanera Norte) and also includes the north-western (Vespucio Norte) and southern (Vespucio Sur) ring roads surrounding this metropolitan area of seven million people.
  • Gearing up for the global electric vehicle revolution
    May 3, 2019
    As transport, communications and energy networks become inextricably linked, policy makers are recognising the implications for our built environment – and the growing electric vehicle market will have a major impact on the world’s infrastructure, says Rolton Group’s Chris Evans
  • EU supports Netherlands greener fuel pilot
    March 13, 2015
    The EU's TEN-T Programme is to provide over US$4 million of funding for a study and pilot on the development of alternative refuelling infrastructure on the main Dutch highways. A network of greener and cheaper liquefied natural gas (LNG) and liquefied bio gas (LBG) service stations will help to prepare the roll-out at European level. The project aims to pave the way for the European deployment of LNG/LBG as a fuel for medium and long haul road transport. To this end, the project will pilot the construction