Skip to main content

EU electronic toll service has fallen behind schedule

According to a recent report by the European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met. The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires me
September 10, 2012 Read time: 2 mins
According to a recent report by the 1690 European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met.

The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires member states to open their tolling systems to commercial EETS providers. EETS must be available to all vehicle categories by October 2014.

The report blames incomplete national transposition of the required rules in most member states. There has also been a delay in the necessary investment in both the systems and the resting required by toll chargers.

In response to the report, the Commission has published a warning that it will launch infringement proceedings against member states that fail to meet their obligations to roll out the service. But it also lays out possible assistance the Commission could offer to help speed up the roll-out, including financial assistance for interoperability projects between member states, under the trans-European transport programme.

For more information on companies in this article

Related Content

  • Worldwide electronic toll collection market to double between 2016 and 2025
    June 15, 2015
    Ptolemus Consulting Group has released the 2015 edition of its electronic toll collection (ETC) Global Study 2015, which indicates that the average penetration of electronic tolling by revenue in Europe is set to increase from 71 per cent in 2015 to 86 per cent in 2025. The growth is lead by the increase use of road user charging schemes dedicated to trucks following the first steps made by Germany.
  • European Commission aids deployment of eCall
    December 4, 2012
    The European Commission has adopted a measure to ensure that by 2015 vehicles can call emergency services in the event of a crash. The Commission wants the life-saving eCall system to be fitted to all new models of cars and light vehicles from 2015. eCall automatically dials Europe's single emergency number 112 in the event of a serious accident and communicates the vehicle's location to the emergency services. According to some estimates, eCall could speed emergency response times by 40per cent in urban ar
  • EU defines nine European transport corridors
    November 19, 2013
    As part of the revision of its infrastructure policies, the European Commission (EU) has defined nine corridors aimed at transforming road transport, rail connections, flights and transport by water into a uniform and efficient European network (Trans-European transport network of TEN-T). These corridors are the Adriatic Baltic Sea region, the North Sea-Baltic region, the Mediterranean region, the East and East Mediterranean region, Scandinavia-Mediterranean, Rhine-Alps, Atlantic, North Sea-Mediterranean
  • SNCF uses ITS to make crossings safer
    May 19, 2021
    There are too many deaths where road and rail intersect: Virginie Taillandier, smart level crossing project manager at French rail group SNCF, outlines how ITS communications can help