Skip to main content

EU electronic toll service has fallen behind schedule

According to a recent report by the European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met. The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires me
September 10, 2012 Read time: 2 mins
According to a recent report by the 1690 European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met.

The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires member states to open their tolling systems to commercial EETS providers. EETS must be available to all vehicle categories by October 2014.

The report blames incomplete national transposition of the required rules in most member states. There has also been a delay in the necessary investment in both the systems and the resting required by toll chargers.

In response to the report, the Commission has published a warning that it will launch infringement proceedings against member states that fail to meet their obligations to roll out the service. But it also lays out possible assistance the Commission could offer to help speed up the roll-out, including financial assistance for interoperability projects between member states, under the trans-European transport programme.

For more information on companies in this article

Related Content

  • Need for simpler urban tolling solutions
    January 10, 2013
    A common assumption, even amongst informed observers, is that there’s but a handful of urban charging schemes in operation around the world and scant prospect of that changing any time soon. Larger city-sized schemes such as Singapore, London and Stockholm come readily to mind but if we take a wider view and also consider urban access control and Low Emission Zones (LEZs) then the picture changes rather radically. There is a notable concentration of such schemes in Europe but worldwide the number is comfort
  • Brazil opts for freeflow tolling
    April 9, 2014
    David Crawford explores the technical background of Brazil’s First multi-lane free-flow tolling system. The 2013 opening of Brazil’s first fully-operational, all-vehicle, multi-lane free-flow (MLFF) tolling system in the state of São Paolo has set the scene for a new phase of modern electronic fee collection (EFC) deployment in Latin America’s largest country. It has toll programmes at both federal and state levels, with São Paulo – the most populous state, with the largest road network – leading in the awa
  • Where is tolling tech taking us?
    September 25, 2019
    From DSRC and RFID to GNSS or smartphones – which technology is ‘best’ for tolls, charging and pricing schemes? In the first of two articles, Josef Czako examines the options
  • Euro MEPs back plan for automatic 112 call
    February 12, 2014
    The European Parliament's internal market committee has backed EU plans for all new types of car and van to be fitted with automated emergency call devices but opened the door to postponing their introduction beyond the proposed deadline of October 2015. The vote on eCall gives a green light for a pan-European type approval method to ensure the devices meet the necessary technical standards. The decision follows a vote in December in the transport committee to approve legislation for member states to develo