Skip to main content

EU electronic toll service has fallen behind schedule

According to a recent report by the European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met. The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires me
September 10, 2012 Read time: 2 mins
According to a recent report by the 1690 European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met.

The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires member states to open their tolling systems to commercial EETS providers. EETS must be available to all vehicle categories by October 2014.

The report blames incomplete national transposition of the required rules in most member states. There has also been a delay in the necessary investment in both the systems and the resting required by toll chargers.

In response to the report, the Commission has published a warning that it will launch infringement proceedings against member states that fail to meet their obligations to roll out the service. But it also lays out possible assistance the Commission could offer to help speed up the roll-out, including financial assistance for interoperability projects between member states, under the trans-European transport programme.

For more information on companies in this article

Related Content

  • ASECAP conference debates EU’s changes to concessions
    April 30, 2015
    Colin Sowman picks some highlights from a one- day ASECAP Conference about the EU's new regulations on Concessions. ASECAP, the association of European tolling companies, has outlined the scale of the challenge facing authorities and tolling companies in complying with the European Union’s Directives 2014/23/EU and 2014/24/EU in a new report and at a special conference in Brussels.
  • Preparations building for French national truck toll
    September 12, 2012
    The Autostrade led Ecomouv consortium is developing the next big system of truck tolling likely to be introduced in Europe – France’s ‘Eco-tax’. Jon Masters reports. Since October last year, a consortium of companies has been working on developing the technological and administrative systems necessary for a national system of truck tolling in France. Eco-tax, France’s truck toll, is not necessarily going to be implemented. The Ecomouv consortium has been set up as a long term concessionaire, but so far only
  • Travel times halve for tolling converts
    August 5, 2013
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • Asecap Days delves beneath the surface of tolling
    August 8, 2017
    Colin Sowman picks his highlights from Asecap’s 45th annual Study and Information Days in Paris. European tolling association Asecap holds annual Study & Information Days, provides delegates with updates on the latest moves and thinking in the tolling sector and is a key meeting place for concessionaires from 22 countries. The importance of road transport to the French economy was highlighted by the country’s director general of transport infrastructures, François Poupard, in the opening session. He told th