Skip to main content

EU electronic toll service has fallen behind schedule

According to a recent report by the European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met. The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires me
September 10, 2012 Read time: 2 mins
According to a recent report by the 1690 European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met.

The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires member states to open their tolling systems to commercial EETS providers. EETS must be available to all vehicle categories by October 2014.

The report blames incomplete national transposition of the required rules in most member states. There has also been a delay in the necessary investment in both the systems and the resting required by toll chargers.

In response to the report, the Commission has published a warning that it will launch infringement proceedings against member states that fail to meet their obligations to roll out the service. But it also lays out possible assistance the Commission could offer to help speed up the roll-out, including financial assistance for interoperability projects between member states, under the trans-European transport programme.

For more information on companies in this article

Related Content

  • UTA launches Europe-wide toll solution
    April 4, 2018
    Union Tank Eckstein (UTA) has launched a solution for European electronic toll services (EETS) with the intention of allowing transport companies and forwarding agents to travel with a single on-board unit with all fees charged to one invoice. Called UTA One, the platform initially supports the toll systems in Belgium, France, Italy, Austria, Poland, Portugal and Spain. Germany and other European countries will be added through an over-the-air update. This option is also said to feature the integration
  • Are e-scooters safe for cities?
    November 6, 2019
    Electric scooters are promoted as both a lifestyle choice and an environmentally friendly means of solving first- and last-mile challenges.
  • Pluto pictures highlight satellite potential
    August 12, 2015
    Along with many others on planet Earth, I have been captivated by the amazing images of Pluto’s surface captured by NASA’s New Horizons spacecraft and sent back across some 4.3 billion kilometres (2.7bn miles) of space. The capture and transmission of such detailed images highlights the progress in the whole area of satellite technology and prompts the mind to contemplate the potential that the increasing number of earth-orbiting satellites could hold for the transport sector.
  • New opportunities in a data-rich future
    March 19, 2014
    Jason Barnes looks at where the detection and monitoring sector is heading. In the future, there will be no such thing as an un-instrumented road. Just a short time ago, that could have been a quote from a high-level policy document but with the first arrivals of vehicles with 802.11p connectivity – the door-opener to Vehicle-to-X (V2X) applications – it’s a statement which has increasing validity. The technology which uses our roads will also provide information on road conditions but V2X isn’t the only