Skip to main content

EU electronic toll service has fallen behind schedule

According to a recent report by the European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met. The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires me
September 10, 2012 Read time: 2 mins
According to a recent report by the 1690 European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met.

The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires member states to open their tolling systems to commercial EETS providers. EETS must be available to all vehicle categories by October 2014.

The report blames incomplete national transposition of the required rules in most member states. There has also been a delay in the necessary investment in both the systems and the resting required by toll chargers.

In response to the report, the Commission has published a warning that it will launch infringement proceedings against member states that fail to meet their obligations to roll out the service. But it also lays out possible assistance the Commission could offer to help speed up the roll-out, including financial assistance for interoperability projects between member states, under the trans-European transport programme.

For more information on companies in this article

Related Content

  • Vitronic to supply Netherlands truck toll observation system
    July 12, 2024
    From 2026, truck owners will pay a fee based on kilometres driven on highways
  • Taking the long view of ITS
    March 24, 2015
    Caroline Visser believes the ITS industry must present a coherent case for consideration of the technology to become part of transport policy and planning. As ITS advisor and road finance director for the International Road Federation (IRF) in Geneva, Caroline Visser is well placed to evaluate quantifying the benefits of ITS implementation – a topic about which there is little agreement and even less consistency. She is pressing to get some consistency in the evaluation of ITS deployments through the use of
  • Cut freight deliveries – improve Southampton’s air quality
    November 23, 2018
    Taking the pressure off cities’ road networks can have a beneficial effect on the environment. David Crawford looks at a new economic model which seeks to quantify the societal effect of freight traffic in Southampton, one of the UK’s five most polluted cities Cuts of 60% or more in volumes of freight deliveries are being predicted - along with badly-needed improvements in air quality - from a load consolidation scheme currently being introduced in the UK port city of Southampton. The forecasts are based o
  • Asecap Days 2025: seizing the opportunities
    May 28, 2025
    Delegates during day one of the two-day 52nd Asecap Days conference in Madrid were left in no doubt the financial challenges that face motorway concessionaires as the transition to different mobility increases in pace...